6,630
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0292 #08 Y:1996 | 08 | 1996 | Optimize plant power factor | $8,246 | $28,000 | |
| OR0292 #07 Y:1996 | 07 | 1996 | Insulate glazing, walls, ceilings, and roofs | $12,370 | $23,720 | |
| OR0292 #06 Y:1996 | 06 | 1996 | Utilize higher efficiency lamps and/or ballasts | $2,202 | $1,144 | |
| OR0292 #05 Y:1996 | 05 | 1996 | Keep boiler tubes clean | $7,179 | $500 | |
| OR0292 #04 Y:1996 | 04 | 1996 | Use other waste concentration methods | $6,602 | $10,000 | |
| OR0292 #03 Y:1996 | 03 | 1996 | Use decanting, flotation to remove contaminants | $11,080 | $2,000 | |
| OR0292 #02 Y:1996 | 02 | 1996 | Use a different or recycled raw material | $17,850 | - | |
| OR0292 #01 Y:1996 | 01 | 1996 | Develop standard procedures to improve internal yields | $116,300 | - | |
| OD0081 #05 Y:1996 | 05 | 1996 | Eliminate old stock and modify inventory control | $551,875 | $51,389 | n/a |
| OD0081 #04 Y:1996 | 04 | 1996 | Eliminate a by-product | $204,312 | $6,350 | n/a |
| OD0081 #03 Y:1996 | 03 | 1996 | Regrind, reuse, or sell scrap plastic parts | $485 | - | n/a |
| OD0081 #02 Y:1996 | 02 | 1996 | Shut off pilots in standby equipment | $222 | - | n/a |
| OD0081 #01 Y:1996 | 01 | 1996 | Utilize higher efficiency lamps and/or ballasts | $2,491 | $5,176 | n/a |
| NC0109 #07 Y:1996 | 07 | 1996 | Expand operations into unused space | $3,436,000 | $2,250,000 | |
| NC0109 #06 Y:1996 | 06 | 1996 | Use distillation, evaporation to remove contaminants | $9,315 | $30,000 | |
| NC0109 #05 Y:1996 | 05 | 1996 | Analyze flue gas for proper air/fuel ratio | $6,281 | $1,200 | |
| NC0109 #04 Y:1996 | 04 | 1996 | Use most efficient type of electric motors | $210 | $402 | |
| NC0109 #03 Y:1996 | 03 | 1996 | Reschedule plant operations or reduce load to avoid peaks | $6,246 | - | |
| NC0109 #02 Y:1996 | 02 | 1996 | Use / purchase optimum sized compressor | $6,491 | $650 | |
| NC0109 #01 Y:1996 | 01 | 1996 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,734 | $630 |