Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,630

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0292 #08 Y:1996 Optimize plant power factor $8,246 $28,000
OR0292 #07 Y:1996 Insulate glazing, walls, ceilings, and roofs $12,370 $23,720
OR0292 #06 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,202 $1,144
OR0292 #05 Y:1996 Keep boiler tubes clean $7,179 $500
OR0292 #04 Y:1996 Use other waste concentration methods $6,602 $10,000
OR0292 #03 Y:1996 Use decanting, flotation to remove contaminants $11,080 $2,000
OR0292 #02 Y:1996 Use a different or recycled raw material $17,850 -
OR0292 #01 Y:1996 Develop standard procedures to improve internal yields $116,300 -
OD0081 #05 Y:1996 Eliminate old stock and modify inventory control $551,875 $51,389
OD0081 #04 Y:1996 Eliminate a by-product $204,312 $6,350
OD0081 #03 Y:1996 Regrind, reuse, or sell scrap plastic parts $485 -
OD0081 #02 Y:1996 Shut off pilots in standby equipment $222 -
OD0081 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,491 $5,176
NC0109 #07 Y:1996 Expand operations into unused space $3,436,000 $2,250,000
NC0109 #06 Y:1996 Use distillation, evaporation to remove contaminants $9,315 $30,000
NC0109 #05 Y:1996 Analyze flue gas for proper air/fuel ratio $6,281 $1,200
NC0109 #04 Y:1996 Use most efficient type of electric motors $210 $402
NC0109 #03 Y:1996 Reschedule plant operations or reduce load to avoid peaks $6,246 -
NC0109 #02 Y:1996 Use / purchase optimum sized compressor $6,491 $650
NC0109 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,734 $630