Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,879

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0282 #11 Y:2019 Meter recycled water (to reduce sewer charges) $5,699 $18,720
MZ0282 #10 Y:2019 Reduce the pressure of compressed air to the minimum required $3,466 $2,964
MZ0282 #09 Y:2019 Utilize energy-efficient belts and other improved mechanisms $3,909 $680
MZ0282 #08 Y:2019 Install vinyl strip / high speed / air curtain doors $53,310 $16,200
MZ0282 #07 Y:2019 Recover waste heat from equipment $7,721 $7,200
MZ0282 #06 Y:2019 Preheat combustion air with waste heat $3,100 $14,000
MZ0282 #05 Y:2019 Purchase new equipment to reduce material use / cost $287,984 $1,030,500
MZ0282 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $1,849 $320
MZ0282 #03 Y:2019 Install compressor air intakes in coolest locations $4,896 $2,300
MZ0282 #02 Y:2019 Install equipment (eg compactor) to reduce disposal costs $6,947 $24,000
MZ0282 #01 Y:2019 Install spectral reflectors / delamp $586 $472
MZ0280 #12 Y:2019 Install compressor air intakes in coolest locations $1,153 $550
MZ0280 #11 Y:2019 Utilize energy-efficient belts and other improved mechanisms $2,072 $1,664
MZ0280 #10 Y:2019 Remove or close off unneeded compressed air lines $3,747 $6,080
MZ0280 #09 Y:2019 Utilize daylight whenever possible in lieu of artificial light $4,436 $8,160
MZ0280 #08 Y:2019 Reschedule plant operations or reduce load to avoid peaks $4,754 $3,520
MZ0280 #07 Y:2019 Pay utility bills on time $5,205 -
MZ0280 #06 Y:2019 Reduce the pressure of compressed air to the minimum required $9,016 $3,196
MZ0280 #05 Y:2019 Install occupancy sensors $14,313 $9,858
MZ0280 #04 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $15,792 $2,148