Assessment Year | 2019 |
---|---|
Principal Product | Plastic Injection/Blow Molding Parts |
NAICS | 326121: Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3082: Unsupported Plastics Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
200,000
ft2
|
Annual Production | 10,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,091,051 | 17,200,800 |
kWh
|
$0.063 |
Electricity Demand | $96,085 | 33,682 |
kW-mo/yr
|
$2.85 |
Electricity Fees | $29,535 | - |
|
- |
TOTAL YEARLY COSTS | $1,216,671 | |||
RECOMMENDED SAVINGS* | $127,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $24,867 | $24,520 |
$19,785
312,067
kWh
|
$5,082
-
kW-mo/yr
|
- | - | |
02 | 2.2515: Use optimum thickness insulation | $23,499 | $2,058 |
$23,499
370,645
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,503 | $24,934 |
$16,634
262,356
kWh
|
$1,869
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,792 | $2,148 |
$16,011
252,536
kWh
|
$1,029
-
kW-mo/yr
|
- | $(-1,248.0) | |
05 | 2.7135: Install occupancy sensors | $14,313 | $9,858 |
$13,449
212,132
kWh
|
$864
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,016 | $3,196 |
$8,472
133,630
kWh
|
$544
-
kW-mo/yr
|
- | - | |
07 | 2.8123: Pay utility bills on time | $5,205 | - | - | - | $5,205 | - | |
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,754 | $3,520 | - |
$4,754
-
kW-mo/yr
|
- | - | |
09 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $4,436 | $8,160 |
$3,787
59,724
kWh
|
$649
-
kW-mo/yr
|
- | - | |
10 | 2.4235: Remove or close off unneeded compressed air lines | $3,747 | $6,080 |
$2,980
46,998
kWh
|
$767
-
kW-mo/yr
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,072 | $1,664 |
$1,947
30,712
kWh
|
$125
-
kW-mo/yr
|
- | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $1,153 | $550 |
$1,085
17,113
kWh
|
$68
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $127,357 | $86,688 |
$107,649
1,697,913
kWh
|
$15,751
-
kW-mo/yr
|
$5,205 | $(-1,248.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs