ITAC Assessment: GT0568
ITAC logo
ITAC Assessment: GT0568
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Bottles
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 120,370
ft2
Annual Production 4,250,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $404,895 7,899,179
kWh
Natural Gas $9,789 1,523
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8114: Change rate schedules or other changes in utility service $6,640 $13,280 $6,640
-
kWh
02 2.7241: Install outside air damper / economizer on hvac unit $10,600 $17,000 $10,600
176,143
kWh
03 2.2628: Utilize a less expensive cooling method $2,630 $4,400 $2,630
53,927
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,740 $3,500 $4,740
-
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,880 $3,190 $2,880
41,032
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,180 $10,800 $5,180
135,991
kWh
TOTAL RECOMMENDED $32,670 $52,170 $32,670
407,093
kWh
TOTAL IMPLEMENTED $18,660 $30,990 $18,660
353,166
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs