Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,141

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0285 #06 Y:2004 Replace hydraulic / pneumatic equipment with electric equipment $218 $586
SF0285 #05 Y:2004 Install occupancy sensors $858 $2,022
SF0285 #04 Y:2004 Use / purchase optimum sized compressor $674 -
SF0285 #03 Y:2004 Reduce illumination to minimum necessary levels $808 -
SF0285 #02 Y:2004 Reduce the pressure of compressed air to the minimum required $1,594 -
SF0285 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,525 -
BD0262 #17 Y:2004 Change procedures / equipment / operating conditions $560 $500
BD0262 #16 Y:2004 Pay bills on time to avoid late fees $2,231 -
BD0262 #15 Y:2004 Change procedures / equipment / operating conditions $1,724 $250
BD0262 #14 Y:2004 Meter recycled water (to reduce sewer charges) $11,289 $5,500
BD0262 #13 Y:2004 Change procedures / equipment / operating conditions $13,000 $300
BD0262 #12 Y:2004 Install automatic packing equipment $436,800 $99,000
BD0262 #11 Y:2004 Lease / purchase baler; sell cardboard to recycler $32,008 $100
BD0262 #10 Y:2004 Reduce illumination to minimum necessary levels $603 $90
BD0262 #09 Y:2004 Use outside cold water source as a supply of cooling water $945 $1,600
BD0262 #08 Y:2004 Use most efficient type of electric motors $287 $286
BD0262 #07 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,261 $850
BD0262 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $3,093 -
BD0262 #05 Y:2004 Install occupancy sensors $3,267 $1,200
BD0262 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,116 $8,920