Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,848

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ND0346 #11 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,834 $7,999
ND0346 #10 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $238 $60
ND0346 #09 Y:2000 Install compressor air intakes in coolest locations $1,454 $750
ND0346 #08 Y:2000 Replace water cooling on processes with air cooling $16,244 $61,500
ND0346 #07 Y:2000 Install timers and/or thermostats $838 $1,125
ND0346 #06 Y:2000 Use closed cycle process to minimize waste water production $38,499 $40,000
ND0346 #05 Y:2000 Change rate schedules or other changes in utility service $12,004 $50
ND0346 #04 Y:2000 Check for accuracy of utility / power meters $25,612 $500
ND0346 #03 Y:2000 Develop a repair/replace policy $1,357 $20,552
ND0346 #02 Y:2000 Preheat combustion air with waste heat $7,277 $20,000
ND0346 #01 Y:2000 Use heat in flue gases to preheat products or materials $24,189 $150,000
MO0274 #10 Y:2000 Begin a practice of predictive / preventative maintenance $2,940 $3,700
MO0274 #09 Y:2000 Install equipment (eg compactor) to reduce disposal costs $7,680 $19,700
MO0274 #08 Y:2000 Contract a wood pallet recycling company $10,000 -
MO0274 #07 Y:2000 Lease / purchase baler; sell cardboard to recycler $29,250 -
MO0274 #06 Y:2000 Utilize energy-efficient belts and other improved mechanisms $5,698 -
MO0274 #05 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $161 $612
MO0274 #04 Y:2000 Reduce the pressure of compressed air to the minimum required $3,933 $120
MO0274 #03 Y:2000 Install compressor air intakes in coolest locations $3,273 $263
MO0274 #02 Y:2000 Use most efficient type of electric motors $4,894 $8,372