ITAC Assessment: MO0274
ITAC logo
ITAC Assessment: MO0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Polypropylene Food Containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 135,000
ft2
Annual Production 16,639,101
lb
Production Hrs. Annual 8,568
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $608,852 15,083,236
kWh
Electricity Demand $45,249 2,538
kW-mo/yr
Electricity Fees $108,641 -
Natural Gas $20,898 4,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,236

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,337 $2,475 $1,177
24,619
kWh
$160
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $4,894 $8,372 $4,609
96,424
kWh
$285
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $3,273 $263 $2,970
62,134
kWh
$303
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,933 $120 $3,559
74,443
kWh
$374
-
kW-mo/yr
- - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $161 $612 $182
3,810
kWh
$53
-
kW-mo/yr
$(-74.0)
-
MMBtu
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,698 - $5,324
111,372
kWh
$374
-
kW-mo/yr
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $29,250 - - - - $29,250
-
lb
- -
08 3.5316: Contract a wood pallet recycling company $10,000 - - - - $10,000
-
lb
- -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,680 $19,700 - - - - $7,680 -
10 4.611: Begin a practice of predictive / preventative maintenance $2,940 $3,700 - - - - - $2,940
TOTAL RECOMMENDED $69,166 $35,242 $17,821
372,802
kWh
$1,549
-
kW-mo/yr
$(-74.0)
-
MMBtu
$39,250
-
lb
$7,680 $2,940
TOTAL IMPLEMENTED $32,236 $15,542 $17,821
372,802
kWh
$1,549
-
kW-mo/yr
$(-74.0)
-
MMBtu
$10,000
-
lb
- $2,940
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs