Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0534 #07 Y:2003 Install equipment (eg compactor) to reduce disposal costs $6,624 $21,000
MA0534 #06 Y:2003 Improve air circulation with destratification fans / other methods $10,591 $8,425
MA0534 #05 Y:2003 Install / repair insulation on steam lines $19,634 $12,975
MA0534 #04 Y:2003 Use hot process fluids to preheat incoming process fluids $20,457 $67,665
MA0534 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $27,487 $53,950
MA0534 #02 Y:2003 Use heat in flue gases to preheat products or materials $76,320 $57,480
MA0534 #01 Y:2003 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $223,213 $1,257,060
WV0268 #13 Y:2003 Develop a repair/replace policy $6,152 $450
WV0268 #12 Y:2003 Turn off equipment during breaks, reduce operating time $1,545 -
WV0268 #11 Y:2003 Use waste heat from hot flue gases to preheat $2,827 $1,855
WV0268 #10 Y:2003 Insulate bare equipment $24,688 $2,019
WV0268 #09 Y:2003 Install occupancy sensors $927 $600
WV0268 #08 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,404 $6,834
WV0268 #07 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,262 -
WV0268 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $27,769 $20,880
WV0268 #05 Y:2003 Reduce illumination to minimum necessary levels $7,261 $720
WV0268 #04 Y:2003 Improve lubrication practices $1,165 $810
WV0268 #03 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $2,612 $250
WV0268 #02 Y:2003 Install compressor air intakes in coolest locations $3,489 $630
WV0268 #01 Y:2003 Reduce the pressure of compressed air to the minimum required $5,435 $108