Assessment Year | 2003 |
---|---|
Principal Product | Knitted stretch fabric |
NAICS | 315190: Other Apparel Knitting Mills |
SIC | 2259: Knitting Mills, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
91,946
ft2
|
Annual Production | 54,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $386,245 | 5,572,000 |
kWh
|
$0.069 |
Electricity Demand | $38,099 | 13,080 |
kW-mo/yr
|
$2.91 |
Electricity Fees | $3,796 | - |
|
- |
Fuel Oil #2 | $682,349 | 98,041 |
MMBtu
|
$6.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $389,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $223,213 | $1,257,060 |
$386,245
5,572,000
kWh
|
$38,099
-
kW-mo/yr
|
$(-265,089.0)
-
MMBtu
|
$63,958
-
MMBtu
|
- | |
02 | 2.2424: Use heat in flue gases to preheat products or materials | $76,320 | $57,480 | - | - | - |
$76,320
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,487 | $53,950 |
$2,524
35,850
kWh
|
- | - |
$24,963
-
MMBtu
|
- | |
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $20,457 | $67,665 |
$(-4,727.0)
(-67,140)
kWh
|
$(-380.0)
-
kW-mo/yr
|
- |
$25,564
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $19,634 | $12,975 | - | - | - |
$19,634
-
MMBtu
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $10,591 | $8,425 |
$10,591
150,436
kWh
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,624 | $21,000 | - | - | - | - | $6,624 | |
08 | 2.2437: Recover waste heat from equipment | $4,663 | $9,742 | - | - | - |
$4,663
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $470 | $1,416 |
$470
6,682
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $389,459 | $1,489,713 |
$395,103
5,697,828
kWh
|
$37,719
-
kW-mo/yr
|
$(-265,089.0)
-
MMBtu
|
$215,102
-
MMBtu
|
$6,624 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs