ITAC Assessment: MA0534
ITAC logo
ITAC Assessment: MA0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Knitted stretch fabric
NAICS 315190: Other Apparel Knitting Mills
SIC 2259: Knitting Mills, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 91,946
ft2
Annual Production 54,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,245 5,572,000
kWh
Electricity Demand $38,099 13,080
kW-mo/yr
Electricity Fees $3,796 -
Fuel Oil #2 $682,349 98,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $389,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $223,213 $1,257,060 $386,245
5,572,000
kWh
$38,099
-
kW-mo/yr
$(-265,089.0)
-
MMBtu
$63,958
-
MMBtu
-
02 2.2424: Use heat in flue gases to preheat products or materials $76,320 $57,480 - - - $76,320
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,487 $53,950 $2,524
35,850
kWh
- - $24,963
-
MMBtu
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $20,457 $67,665 $(-4,727.0)
(-67,140)
kWh
$(-380.0)
-
kW-mo/yr
- $25,564
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $19,634 $12,975 - - - $19,634
-
MMBtu
-
06 2.7243: Improve air circulation with destratification fans / other methods $10,591 $8,425 $10,591
150,436
kWh
- - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,624 $21,000 - - - - $6,624
08 2.2437: Recover waste heat from equipment $4,663 $9,742 - - - $4,663
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $470 $1,416 $470
6,682
kWh
- - - -
TOTAL RECOMMENDED $389,459 $1,489,713 $395,103
5,697,828
kWh
$37,719
-
kW-mo/yr
$(-265,089.0)
-
MMBtu
$215,102
-
MMBtu
$6,624
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs