ITAC Assessment: MI0165
ITAC logo
ITAC Assessment: MI0165
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pharmaceutical Pill Packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 130,000
ft2
Annual Production 1,223,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,386 2,334,200
kWh
Electricity Demand $21,790 6,316
kW-mo/yr
Electricity Fees $31,049 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $94,777 $315,000 $89,854
1,041,397
kWh
$4,923
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $33,654 $41,800 $31,197
361,080
kWh
$2,457
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,875 $1,210 $20,446
236,644
kWh
$1,429
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,496 $40 $7,837
90,709
kWh
$659
-
kW-mo/yr
05 2.2511: Insulate bare equipment $4,023 $1,957 $3,405
36,150
kWh
$618
-
kW-mo/yr
TOTAL RECOMMENDED $162,825 $360,007 $152,739
1,765,980
kWh
$10,086
-
kW-mo/yr
TOTAL IMPLEMENTED $68,048 $45,007 $62,885
724,583
kWh
$5,163
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs