| Assessment Year | 1996 |
|---|---|
| Principal Product | Vacuum Pumps & Cryogenic Compressors |
| NAICS |
n/a
|
| SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
| Sales Range | n/a |
| # of Employees | 150 |
| Plant Area |
50,000
ft2
|
| Annual Production | 3,600
pieces
|
| Production Hrs. Annual | 7,410
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $196,172 | 3,307,737 |
kWh
|
$0.059 |
| Electricity Demand | $43,193 | 6,218 |
kW-mo/yr
|
$6.95 |
| Electricity Fees | $1,151 | - |
|
- |
| Natural Gas | $6,645 | 997 |
MMBtu
|
$6.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,362 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,015 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $368 | $260 |
$368
6,155
kWh
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,415 | $600 |
$1,415
23,740
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $4,010 | $1,600 |
$4,010
176,729
kWh
|
- | - | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $9,058 | $200 |
$6,966
117,526
kWh
|
$2,092
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $492 | $163 |
$401
6,741
kWh
|
$91
-
kW-mo/yr
|
- | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,419 | $3,575 |
$1,419
69,461
kWh
|
- | - | |
| 07 | 2.2135: Repair and eliminate steam leaks | $6,600 | $600 | - | - |
$6,600
-
lb
|
|
| TOTAL RECOMMENDED | $23,362 | $6,998 |
$14,579
400,352
kWh
|
$2,183
-
kW-mo/yr
|
$6,600
-
lb
|
||
| TOTAL IMPLEMENTED | $8,015 | $1,200 |
$1,415
23,740
kWh
|
- |
$6,600
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Gaseous Waste Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs