ITAC Assessment: AM0358
ITAC logo
ITAC Assessment: AM0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Industrial and oil field screens
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 65,000
ft2
Annual Production 105,130
pieces
Production Hrs. Annual 2,403
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,444 813,306
kWh
Electricity Demand $9,369 3,262
kW-mo/yr
Natural Gas $6,048 1,307
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,480 $1,500 $3,480
70,926
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $2,680 $80 $2,200
44,842
kWh
$480
-
kW-mo/yr
03 2.7224: Reduce space conditioning during non-working hours $2,566 - $2,136
43,669
kWh
$430
-
kW-mo/yr
04 2.3212: Optimize plant power factor $1,700 $4,530 - $1,700
-
kW-mo/yr
05 2.7124: Make a practice of turning off lights when not needed $190 - $190
3,810
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $115 $110 $115
2,345
kWh
-
TOTAL RECOMMENDED $10,731 $6,220 $8,121
165,592
kWh
$2,610
-
kW-mo/yr
TOTAL IMPLEMENTED $7,975 $6,220 $5,795
118,113
kWh
$2,180
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs