ITAC Assessment: NC0588
ITAC logo
ITAC Assessment: NC0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wastewater treatment plant
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 37
Plant Area 50,000
ft2
Annual Production 10,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,292 13,972,000
kWh
Electricity Demand $516,032 29,698
kW-mo/yr
Electricity Fees $98,484 -
Natural Gas $40,000 10,075
MMBtu
TOTAL YEARLY COSTS $1,005,808
RECOMMENDED SAVINGS* $82,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $24,750 $80,000 - - $24,750
-
MMBtu
-
02 2.2628: Utilize a less expensive cooling method $4,845 $38,000 $2,343
103,200
kWh
$2,502
-
kW-mo/yr
- -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $26,851 $133,000 $12,982
571,900
kWh
$13,869
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $23,766 $97,500 $6,711
295,650
kWh
$14,075
-
kW-mo/yr
- $2,980
05 2.4151: Develop a repair/replace policy $2,286 $5,865 $891
39,257
kWh
$1,395
-
kW-mo/yr
- -
TOTAL RECOMMENDED $82,498 $354,365 $22,927
1,010,007
kWh
$31,841
-
kW-mo/yr
$24,750
-
MMBtu
$2,980
TOTAL IMPLEMENTED $26,052 $103,365 $7,602
334,907
kWh
$15,470
-
kW-mo/yr
- $2,980
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs