3,123
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0375 #19 Y:2007 | 19 | 2007 | Reschedule plant operations or reduce load to avoid peaks | $2,275 | - | |
| WV0375 #18 Y:2007 | 18 | 2007 | Utilize higher efficiency lamps and/or ballasts | $2,797 | $10,125 | |
| WV0375 #17 Y:2007 | 17 | 2007 | Install compressor air intakes in coolest locations | $2,975 | $652 | |
| WV0375 #16 Y:2007 | 16 | 2007 | Reduce the pressure of compressed air to the minimum required | $4,374 | $52 | |
| WV0375 #15 Y:2007 | 15 | 2007 | Upgrade controls on compressors | $7,595 | $4,650 | |
| WV0375 #14 Y:2007 | 14 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,983 | $772 | |
| WV0375 #13 Y:2007 | 13 | 2007 | Analyze flue gas for proper air/fuel ratio | $29,817 | $2,000 | |
| WV0375 #12 Y:2007 | 12 | 2007 | Develop a repair/replace policy | $32,477 | $1,338 | |
| WV0375 #11 Y:2007 | 11 | 2007 | Use optimum thickness insulation | $33,427 | $6,567 | |
| WV0375 #10 Y:2007 | 10 | 2007 | Recover waste heat from equipment | $34,143 | $15,525 | |
| WV0375 #09 Y:2007 | 09 | 2007 | Use demand controller or load shedder | $57,494 | $25,520 | |
| WV0375 #08 Y:2007 | 08 | 2007 | Use waste heat from flue gases to heat space conditioning air | $59,537 | $62,535 | |
| WV0375 #07 Y:2007 | 07 | 2007 | Use radiant heater for spot heating | $23,729 | $37,200 | |
| WV0375 #06 Y:2007 | 06 | 2007 | Utilize higher efficiency lamps and/or ballasts | $82,382 | $83,840 | |
| WV0375 #05 Y:2007 | 05 | 2007 | Increase amount of condensate returned | $84,029 | $50,400 | |
| WV0375 #04 Y:2007 | 04 | 2007 | Install waste heat boiler to provide direct power | $97,283 | $434,500 | |
| WV0375 #03 Y:2007 | 03 | 2007 | Use waste heat from hot flue gases to preheat | $250,246 | $168,224 | |
| WV0375 #02 Y:2007 | 02 | 2007 | Adjust burners for efficient operation | $396,584 | $183,040 | |
| WV0375 #01 Y:2007 | 01 | 2007 | Use heat in flue gases to preheat products or materials | $1,181,139 | $1,147,130 | |
| NC0372 #08 Y:2007 | 08 | 2007 | Eliminate or reduce compressed air usage | $10,110 | $8,000 |