ITAC Assessment: NC0372
ITAC logo
ITAC Assessment: NC0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 180,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,600
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $519,764 13,505,930
kWh
Electricity Demand $300,679 24,254
kW-mo/yr
Electricity Fees $21,275 -
Natural Gas $397,877 42,349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $349,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $10,092 $8,000 - $10,092
-
kW-mo/yr
- - -
02 2.8112: Combine utility meters $61,386 $25,000 $61,386
-
kWh
- - - -
03 2.1133: Adjust burners for efficient operation $1,636 $1,600 - - $1,636
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $255,208 $500,000 $(-46,434.0)
(-1,332,000)
kWh
$(-30,902.0)
-
kW-mo/yr
$332,544
-
MMBtu
- -
05 2.2511: Insulate bare equipment $721 $250 - - $721
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $7,090 $50 $4,842
138,905
kWh
$2,248
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,240 $100 $2,773
79,550
kWh
$1,287
-
kW-mo/yr
- $(-420.0) $(-400.0)
08 2.4239: Eliminate or reduce compressed air usage $10,110 $8,000 $6,903
198,030
kWh
$3,207
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $349,483 $543,000 $29,470
(-915,515)
kWh
$(-14,068.0)
-
kW-mo/yr
$334,901
-
MMBtu
$(-420.0) $(-400.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs