5,175
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0290 #08 Y:2003 | 08 | 2003 | Reduce the pressure of compressed air to the minimum required | $1,107 | $300 | |
| WV0290 #07 Y:2003 | 07 | 2003 | Repair and eliminate steam leaks | $2,228 | $150 | |
| WV0290 #06 Y:2003 | 06 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,003 | $100 | |
| WV0290 #05 Y:2003 | 05 | 2003 | Use waste heat from hot flue gases to preheat | $3,244 | $1,800 | |
| WV0290 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $3,392 | $8,050 | |
| WV0290 #03 Y:2003 | 03 | 2003 | Develop a repair/replace policy | $7,121 | $1,000 | |
| WV0290 #02 Y:2003 | 02 | 2003 | Utilize higher efficiency lamps and/or ballasts | $8,220 | $21,673 | |
| WV0290 #01 Y:2003 | 01 | 2003 | Reschedule plant operations or reduce load to avoid peaks | $17,454 | - | |
| WI0466 #07 Y:2003 | 07 | 2003 | Install compressor air intakes in coolest locations | $1,231 | $740 | |
| WI0466 #06 Y:2003 | 06 | 2003 | Recover waste heat from equipment | $1,755 | $1,000 | |
| WI0466 #05 Y:2003 | 05 | 2003 | Reduce / eliminate use of disposable product | $3,550 | - | |
| WI0466 #04 Y:2003 | 04 | 2003 | Use evaporation to concentrate material | $4,435 | $10,000 | |
| WI0466 #03 Y:2003 | 03 | 2003 | Replace city water with recycled water via cooling tower | $4,749 | $9,500 | |
| WI0466 #02 Y:2003 | 02 | 2003 | Install timers and/or thermostats | $7,059 | $1,200 | |
| WI0466 #01 Y:2003 | 01 | 2003 | Utilize higher efficiency lamps and/or ballasts | $9,842 | $30,850 | |
| MI0076 #06 Y:2003 | 06 | 2003 | Install automatic packing equipment | $45,000 | $23,400 | |
| MI0076 #05 Y:2003 | 05 | 2003 | Change rate schedules or other changes in utility service | $3,834 | $400 | |
| MI0076 #04 Y:2003 | 04 | 2003 | Modify storage space to avoid rental of a warehouse | $3,936 | $6,000 | |
| MI0076 #03 Y:2003 | 03 | 2003 | Analyze flue gas for proper air/fuel ratio | $1,535 | $1,370 | |
| MI0076 #02 Y:2003 | 02 | 2003 | Turn off equipment when not in use | $2,032 | $2,300 |