| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LM0015 #09 Y:2001 | 09 | 2001 | Contract out maintenance | $7,300 | - | |
| LM0015 #08 Y:2001 | 08 | 2001 | Schedule deliveries according to demand | $207,000 | $1,000 | |
| LM0015 #07 Y:2001 | 07 | 2001 | Install equipment (eg compactor) to reduce disposal costs | $8,944 | $11,800 | |
| LM0015 #06 Y:2001 | 06 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $100,699 | $450 | |
| LM0015 #05 Y:2001 | 05 | 2001 | Use adjustable frequency drive or multiple speed motors on existing system | $30,965 | $12,950 | |
| LM0015 #04 Y:2001 | 04 | 2001 | Reduce the pressure of compressed air to the minimum required | $5,982 | - | |
| LM0015 #03 Y:2001 | 03 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,264 | $800 | |
| LM0015 #02 Y:2001 | 02 | 2001 | Utilize daylight whenever possible in lieu of artificial light | $5,951 | $550 | |
| LM0015 #01 Y:2001 | 01 | 2001 | Utilize higher efficiency lamps and/or ballasts | $10,371 | $19,200 | |
| BD0191 #13 Y:2001 | 13 | 2001 | Replace existing equipment with more suitable substitutes | $2,250 | $400 | |
| BD0191 #12 Y:2001 | 12 | 2001 | Contract a wood pallet recycling company | $10,000 | $250 | |
| BD0191 #11 Y:2001 | 11 | 2001 | Replace city water with recycled water via cooling tower | $4,828 | $12,000 | |
| BD0191 #10 Y:2001 | 10 | 2001 | Eliminate leaks in water lines and valves | $5,689 | $750 | |
| BD0191 #09 Y:2001 | 09 | 2001 | Install / repair insulation on steam lines | $182 | $405 | |
| BD0191 #08 Y:2001 | 08 | 2001 | Eliminate leaks in inert gas and compressed air lines/ valves | $524 | $800 | |
| BD0191 #07 Y:2001 | 07 | 2001 | Reduce the pressure of compressed air to the minimum required | $559 | - | |
| BD0191 #06 Y:2001 | 06 | 2001 | Install occupancy sensors | $599 | $1,050 | |
| BD0191 #05 Y:2001 | 05 | 2001 | Eliminate or reduce compressed air usage | $995 | $175 | |
| BD0191 #04 Y:2001 | 04 | 2001 | Disconnect ballasts | $1,021 | $1,040 | |
| BD0191 #03 Y:2001 | 03 | 2001 | Install compressor air intakes in coolest locations | $1,185 | $400 |