Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,847

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0336 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $8,664 $11,634
MI0336 #03 Y:2018 Turn off equipment when not in use $17,738 $3,280
MI0336 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $17,939 $48,821
MI0336 #01 Y:2018 Use fossil fuel powered generator during peak demand periods $21,620 $80
SF0524 #10 Y:2018 Adopt in-house material generation $29,406 $113,992
SF0524 #09 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $10,150 -
SF0524 #08 Y:2018 Utilize a less expensive cooling method $6,328 $27,411
SF0524 #07 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $2,992 $9,121
SF0524 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $11,866 $17,240
SF0524 #05 Y:2018 Insulate bare equipment $463 $378
SF0524 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $1,704 $208
SF0524 #03 Y:2018 Reduce space conditioning during non-working hours $7,541 $798
SF0524 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $412 -
SF0524 #01 Y:2018 Modify refrigeration system to operate at a lower pressure $8,926 -
LE0455 #07 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $799 $4,000
LE0455 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,295 $9,500
LE0455 #05 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $3,889 $7,500
LE0455 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $6,674 $12,500
LE0455 #03 Y:2018 Recover waste heat from equipment $3,012 $4,000
LE0455 #02 Y:2018 Utilize energy-efficient belts and other improved mechanisms $1,794 $850