ITAC Assessment: LE0455
ITAC logo
ITAC Assessment: LE0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Concrete Barriers
NAICS 327390: Other Concrete Product Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 67,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,035 512,700
kWh
Electricity Demand $9,813 1,920
kW-mo/yr
Electricity Fees $10,924 -
Natural Gas $108,219 10,276
MMBtu
LPG $56,411 6,781
MMBtu
TOTAL YEARLY COSTS $215,402
RECOMMENDED SAVINGS* $27,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,359 $1,000 $6,308
106,917
kWh
$1,051
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,794 $850 $1,318
22,344
kWh
$476
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $3,012 $4,000 - - $3,012
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,674 $12,500 $5,008
84,886
kWh
$1,666
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,889 $7,500 $3,332
56,477
kWh
$557
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,295 $9,500 $3,682
62,400
kWh
$613
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $799 $4,000 $687
11,638
kWh
$112
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,822 $39,350 $20,335
344,662
kWh
$4,475
-
kW-mo/yr
$3,012
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs