1,636
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| ME0297 #07 Y:2000 | 07 | 2000 | Re-arrange equipment layout to reduce labor costs | $27,000 | $14,835 | n/a |
| ME0297 #06 Y:2000 | 06 | 2000 | Re-arrange equipment layout to reduce labor costs | $54,200 | $28,115 | n/a |
| ME0297 #05 Y:2000 | 05 | 2000 | Make a new by-product | $267,435 | $280,836 | n/a |
| ME0297 #04 Y:2000 | 04 | 2000 | Eliminate leaks in inert gas and compressed air lines/ valves | $964 | $300 | n/a |
| ME0297 #03 Y:2000 | 03 | 2000 | Utilize higher efficiency lamps and/or ballasts | $2,934 | $8,265 | n/a |
| ME0297 #02 Y:2000 | 02 | 2000 | Use adjustable frequency drive or multiple speed motors on existing system | $3,161 | $8,745 | n/a |
| ME0297 #01 Y:2000 | 01 | 2000 | Burn a less expensive grade of fuel | $10,802 | $30,000 | n/a |
| ME0296 #13 Y:2000 | 13 | 2000 | Re-arrange equipment layout to reduce labor costs | $1,875 | $965 | |
| ME0296 #12 Y:2000 | 12 | 2000 | Add equipment/ operators to reduce production bottleneck | $437,500 | $784,300 | |
| ME0296 #11 Y:2000 | 11 | 2000 | Improved material handling (mixing and transfer) | $8,450 | $52,500 | |
| ME0296 #10 Y:2000 | 10 | 2000 | Utilize higher efficiency lamps and/or ballasts | $212 | $518 | |
| ME0296 #09 Y:2000 | 09 | 2000 | Eliminate or reduce compressed air usage | $375 | $230 | |
| ME0296 #08 Y:2000 | 08 | 2000 | Use photocell controls | $387 | $600 | |
| ME0296 #07 Y:2000 | 07 | 2000 | Utilize higher efficiency lamps and/or ballasts | $666 | $1,088 | |
| ME0296 #06 Y:2000 | 06 | 2000 | Install / repair insulation on steam lines | $752 | $490 | |
| ME0296 #05 Y:2000 | 05 | 2000 | Recover waste heat from equipment | $856 | $890 | |
| ME0296 #04 Y:2000 | 04 | 2000 | Pay utility bills on time | $1,617 | - | |
| ME0296 #03 Y:2000 | 03 | 2000 | Replace electrically-operated equipment with fossil fuel equipment | $2,070 | $4,700 | |
| ME0296 #02 Y:2000 | 02 | 2000 | Install compressor air intakes in coolest locations | $2,377 | $2,124 | |
| ME0296 #01 Y:2000 | 01 | 2000 | Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $625,184 | $1,387,500 |