Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,636

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0297 #07 Y:2000 Re-arrange equipment layout to reduce labor costs $27,000 $14,835
ME0297 #06 Y:2000 Re-arrange equipment layout to reduce labor costs $54,200 $28,115
ME0297 #05 Y:2000 Make a new by-product $267,435 $280,836
ME0297 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $964 $300
ME0297 #03 Y:2000 Utilize higher efficiency lamps and/or ballasts $2,934 $8,265
ME0297 #02 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $3,161 $8,745
ME0297 #01 Y:2000 Burn a less expensive grade of fuel $10,802 $30,000
ME0296 #13 Y:2000 Re-arrange equipment layout to reduce labor costs $1,875 $965
ME0296 #12 Y:2000 Add equipment/ operators to reduce production bottleneck $437,500 $784,300
ME0296 #11 Y:2000 Improved material handling (mixing and transfer) $8,450 $52,500
ME0296 #10 Y:2000 Utilize higher efficiency lamps and/or ballasts $212 $518
ME0296 #09 Y:2000 Eliminate or reduce compressed air usage $375 $230
ME0296 #08 Y:2000 Use photocell controls $387 $600
ME0296 #07 Y:2000 Utilize higher efficiency lamps and/or ballasts $666 $1,088
ME0296 #06 Y:2000 Install / repair insulation on steam lines $752 $490
ME0296 #05 Y:2000 Recover waste heat from equipment $856 $890
ME0296 #04 Y:2000 Pay utility bills on time $1,617 -
ME0296 #03 Y:2000 Replace electrically-operated equipment with fossil fuel equipment $2,070 $4,700
ME0296 #02 Y:2000 Install compressor air intakes in coolest locations $2,377 $2,124
ME0296 #01 Y:2000 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $625,184 $1,387,500