| Assessment Year | 2000 |
|---|---|
| Principal Product | 3/4" Finished Pine Boards |
| NAICS |
n/a
|
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
115,000
ft2
|
| Annual Production | 24,000,000
thousand feet
|
| Production Hrs. Annual | 3,750
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $404,362 | 8,044,549 |
kWh
|
$0.050 |
| Electricity Demand | $133,181 | 42,201 |
kW-mo/yr
|
$3.16 |
| Electricity Fees | $16,030 | - |
|
- |
| Fuel Oil #2 | $504,320 | 96,399 |
MMBtu
|
$5.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,082,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Wood Savings | Personnel Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $625,184 | $1,387,500 |
$182,841
5,631,301
kWh
|
$54,839
-
kW-mo/yr
|
- |
$504,320
-
MMBtu
|
$(-116,816.0)
-
MMBtu
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,377 | $2,124 |
$2,377
47,186
kWh
|
- | - | - | - | - | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,070 | $4,700 |
$3,142
62,427
kWh
|
$320
-
kW-mo/yr
|
- |
$(-1,392.0)
-
MMBtu
|
- | - | - | |
| 04 | 2.8123: Pay utility bills on time | $1,617 | - | - | - | $1,617 | - | - | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $856 | $890 | - | - | - |
$856
-
MMBtu
|
- | - | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $752 | $490 | - | - | - |
$752
-
MMBtu
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $666 | $1,088 |
$518
10,258
kWh
|
$148
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.7134: Use photocell controls | $387 | $600 |
$387
7,620
kWh
|
- | - | - | - | - | - | |
| 09 | 2.4239: Eliminate or reduce compressed air usage | $375 | $230 |
$375
7,620
kWh
|
- | - | - | - | - | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $212 | $518 |
$163
3,224
kWh
|
$49
-
kW-mo/yr
|
- | - | - | - | - | |
| 11 | 3.7212: Improved material handling (mixing and transfer) | $8,450 | $52,500 |
$7,036
139,801
kWh
|
$1,414
-
kW-mo/yr
|
- | - | - | - | - | |
| 12 | 4.111: Add equipment/ operators to reduce production bottleneck | $437,500 | $784,300 | - | - | - | - | - | - | $437,500 | |
| 13 | 4.513: Re-arrange equipment layout to reduce labor costs | $1,875 | $965 | - | - | - | - | - | $1,875 | - | |
| TOTAL RECOMMENDED | $1,082,321 | $2,235,905 |
$196,839
5,909,437
kWh
|
$56,770
-
kW-mo/yr
|
$1,617 |
$504,536
-
MMBtu
|
$(-116,816.0)
-
MMBtu
|
$1,875 | $437,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings | Wood Savings | Personnel Changes Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs