Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STAPLING MACHINE COMPONENTS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area
n/a
Annual Production 12,000
pieces
Production Hrs. Annual 1,875
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,901 1,344,959
kWh
Natural Gas $71,634 9,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4312: Improve lubrication practices $351 $800 $351
3,517
kWh
02 2.7111: Reduce illumination to minimum necessary levels $5,622 - $5,622
53,927
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,405 $2,500 $6,405
-
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $889 $150 $889
8,499
kWh
05 2.6218: Turn off equipment when not in use $1,001 $300 $1,001
9,672
kWh
TOTAL RECOMMENDED $14,268 $3,750 $14,268
75,615
kWh
TOTAL IMPLEMENTED $14,268 $3,750 $14,268
75,615
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs