Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,460

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0251 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $8,704 -
WM0250 #10 Y:2025 Utilize energy-efficient belts and other improved mechanisms $544 $180
WM0250 #09 Y:2025 Recharge batteries on during off-peak demand periods $849 $1,650
WM0250 #05 Y:2025 Install compressor air intakes in coolest locations $2,115 $1,677
WM0250 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $3,625 -
WM0249 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,131 -
WM0249 #02 Y:2025 Lower temperature during the winter season and vice-versa $2,929 -
WM0249 #01 Y:2025 Reduce space conditioning during non-working hours $3,470 -
WM0248 #04 Y:2025 Recharge batteries on during off-peak demand periods $1,542 -
WM0248 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $22,211 $18,468
IC0336 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $336 $1,138
IC0336 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $321 $244
IC0336 #06 Y:2025 Lower temperature during the winter season and vice-versa $56 -
IC0336 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $81 $130
IC0336 #02 Y:2025 Recharge batteries on during off-peak demand periods $397 -
IC0336 #01 Y:2025 Use insulation in furnaces to facilitate heating / cooling $9,224 $4,800
WM0246 #02 Y:2025 Recharge batteries on during off-peak demand periods $6,226 -
WM0239 #06 Y:2024 Install occupancy sensors $1,167 $2,240
WM0239 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $6,613 $840
WM0239 #03 Y:2024 Install compressor air intakes in coolest locations $6,251 $3,566