Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,179

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0405 #07 Y:2001 Replace cloth rags with paper towels $759 -
WI0405 #06 Y:2001 Utilize higher efficiency lamps and/or ballasts $1,839 $9,403
WI0405 #05 Y:2001 Install vinyl strip / high speed / air curtain doors $1,216 $500
WI0405 #04 Y:2001 Use a less expensive method of waste removal $2,138 -
WI0405 #03 Y:2001 Use evaporation to concentrate material $3,585 $11,000
WI0405 #02 Y:2001 Utilize controls to operate equipment only when needed $2,749 $2,000
WI0405 #01 Y:2001 Reduce hot water temperature to the minimum required $5,787 $4,500
WI0404 #07 Y:2001 Recharge batteries on during off-peak demand periods $135 $400
WI0404 #06 Y:2001 Install compressor air intakes in coolest locations $256 $640
WI0404 #05 Y:2001 Improve air circulation with destratification fans / other methods $668 $1,600
WI0404 #04 Y:2001 Utilize energy-efficient belts and other improved mechanisms $728 $1,190
WI0404 #03 Y:2001 Install occupancy sensors $798 $2,400
WI0404 #02 Y:2001 Replace city water with recycled water via cooling tower $3,918 $14,500
WI0404 #01 Y:2001 Train operators for maximum operating efficiency $12,000 -
WI0403 #07 Y:2001 Use adjustable frequency drive or multiple speed motors on existing system $685 $3,600
WI0403 #06 Y:2001 Install occupancy sensors $118 $450
WI0403 #05 Y:2001 Utilize higher efficiency lamps and/or ballasts $188 $630
WI0403 #04 Y:2001 Utilize higher efficiency lamps and/or ballasts $3,569 $16,804
WI0403 #03 Y:2001 Use most efficient type of electric motors $7,035 $9,500
WI0403 #02 Y:2001 Utilize controls to operate equipment only when needed $20,523 -