ITAC Assessment: WI0403
ITAC logo
ITAC Assessment: WI0403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Biomedical Instruments
NAICS
n/a
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 67,868
ft2
Annual Production 2,400
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,839 1,866,600
kWh
Electricity Demand $34,140 3,996
kW-mo/yr
Electricity Fees $6,745 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.448: Install automatic part storage / retreval system $82,500 $120,000 - - $82,500
02 2.6231: Utilize controls to operate equipment only when needed $20,523 - $16,111
476,661
kWh
$4,412
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $7,035 $9,500 $5,522
163,374
kWh
$1,513
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,569 $16,804 $1,777
52,583
kWh
$1,792
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $188 $630 $147
4,354
kWh
$41
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $118 $450 $118
3,510
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $685 $3,600 $685
20,258
kWh
- -
TOTAL RECOMMENDED $114,618 $150,984 $24,360
720,740
kWh
$7,758
-
kW-mo/yr
$82,500
TOTAL IMPLEMENTED $20,711 $630 $16,258
481,015
kWh
$4,453
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs