1,130
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UK1912 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $10,541 | - | |
| UK1912 #01 Y:2019 | 01 | 2019 | Install compressor air intakes in coolest locations | $8,744 | $8,695 | |
| UK1911 #08 Y:2019 | 08 | 2019 | Insulate bare equipment | $26,686 | $9,826 | |
| UK1911 #07 Y:2019 | 07 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,750 | - | |
| UK1911 #06 Y:2019 | 06 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $4,615 | $7,400 | |
| UK1911 #05 Y:2019 | 05 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,560 | $3,950 | |
| UK1911 #04 Y:2019 | 04 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $1,363 | $700 | |
| UK1911 #03 Y:2019 | 03 | 2019 | Utilize higher efficiency lamps and/or ballasts | $9,273 | $24,987 | |
| UK1911 #02 Y:2019 | 02 | 2019 | Utilize other methods to remove contaminants | $487,425 | $1,600,000 | |
| UK1911 #01 Y:2019 | 01 | 2019 | Optimize plant power factor | $45,696 | $27,825 | |
| UK1910 #13 Y:2019 | 13 | 2019 | Change rate schedules or other changes in utility service | $7,015 | - | |
| UK1910 #12 Y:2019 | 12 | 2019 | Optimize plant power factor | $13,040 | $16,170 | |
| UK1910 #11 Y:2019 | 11 | 2019 | Analyze flue gas for proper air/fuel ratio | $1,251 | $1,000 | |
| UK1910 #10 Y:2019 | 10 | 2019 | Preheat combustion air with waste heat | $1,344 | $2,838 | |
| UK1910 #09 Y:2019 | 09 | 2019 | Reduce fluid flow rates | $1,484 | $1,900 | |
| UK1910 #08 Y:2019 | 08 | 2019 | Use optimum size and capacity equipment | $1,365 | $3,625 | |
| UK1910 #07 Y:2019 | 07 | 2019 | Use most efficient type of electric motors | $838 | $350 | |
| UK1910 #06 Y:2019 | 06 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $569 | $300 | |
| UK1910 #05 Y:2019 | 05 | 2019 | Utilize higher efficiency lamps and/or ballasts | $65,342 | $110,141 | |
| UK1910 #04 Y:2019 | 04 | 2019 | Keep doors and windows shut when not on use | $4,283 | - |