Assessment Year | 2019 |
---|---|
Principal Product | PVC Door and Window Frames |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 32 |
Plant Area |
345,000
ft2
|
Annual Production | 38,932,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $827,691 | 28,026,000 |
kWh
|
$0.030 | |
Electricity Demand | $815,085 | 51,199 |
kW-mo/yr
|
$15.92 | |
Electricity Fees | $53,437 | - |
|
- | |
Natural Gas | $18,448 | 1,626 |
MMBtu
|
$11.35 | |
Waste Disposal Costs | |||||
Water Usage | $99,127 | 84,150 |
Tgal
|
$1.18 | |
TOTAL YEARLY COSTS | $1,813,788 | ||||
RECOMMENDED SAVINGS* | $262,248 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $138,159 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $8,744 | $8,695 |
$8,744
291,475
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,541 | - |
$10,541
351,372
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,487 | $2,150 |
$16,499
549,953
kWh
|
$11,988
-
kW-mo/yr
|
|
04 | 2.7224: Reduce space conditioning during non-working hours | $8,080 | $363 |
$8,080
269,328
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $1,123 | $3,378 |
$1,123
37,420
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,364 | $30,555 |
$5,073
169,099
kWh
|
$7,291
-
kW-mo/yr
|
|
07 | 2.2691: Shut off cooling if cold outside air will cool process | $16,009 | $41,650 |
$16,009
533,628
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $90,133 | $6,406 |
$52,192
1,739,736
kWh
|
$37,941
-
kW-mo/yr
|
|
09 | 2.6218: Turn off equipment when not in use | $86,767 | $5,000 |
$50,247
1,674,912
kWh
|
$36,520
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $262,248 | $98,197 |
$168,508
5,616,923
kWh
|
$93,740
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $138,159 | $37,705 |
$82,360
2,745,336
kWh
|
$55,799
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |