ITAC Assessment: UK1912
ITAC logo
ITAC Assessment: UK1912
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product PVC Door and Window Frames
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 345,000
ft2
Annual Production 38,932,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $827,691 28,026,000
kWh
Electricity Demand $815,085 51,199
kW-mo/yr
Electricity Fees $53,437 -
Natural Gas $18,448 1,626
MMBtu
Waste Disposal Costs
Water Usage $99,127 84,150
Tgal
TOTAL YEARLY COSTS $1,813,788
RECOMMENDED SAVINGS* $262,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $138,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $8,744 $8,695 $8,744
291,475
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $10,541 - $10,541
351,372
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,487 $2,150 $16,499
549,953
kWh
$11,988
-
kW-mo/yr
04 2.7224: Reduce space conditioning during non-working hours $8,080 $363 $8,080
269,328
kWh
-
05 2.7135: Install occupancy sensors $1,123 $3,378 $1,123
37,420
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,364 $30,555 $5,073
169,099
kWh
$7,291
-
kW-mo/yr
07 2.2691: Shut off cooling if cold outside air will cool process $16,009 $41,650 $16,009
533,628
kWh
-
08 2.2511: Insulate bare equipment $90,133 $6,406 $52,192
1,739,736
kWh
$37,941
-
kW-mo/yr
09 2.6218: Turn off equipment when not in use $86,767 $5,000 $50,247
1,674,912
kWh
$36,520
-
kW-mo/yr
TOTAL RECOMMENDED $262,248 $98,197 $168,508
5,616,923
kWh
$93,740
-
kW-mo/yr
TOTAL IMPLEMENTED $138,159 $37,705 $82,360
2,745,336
kWh
$55,799
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs