1,130
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UK2002 #05 Y:2020 | 05 | 2020 | Change procedures / equipment / operating conditions | $17,165 | - | |
| UK2002 #04 Y:2020 | 04 | 2020 | Utilize controls to operate equipment only when needed | $460 | - | |
| UK2002 #03 Y:2020 | 03 | 2020 | Establish equipment maintenance schedule | $800 | - | |
| UK2002 #02 Y:2020 | 02 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $473 | $160 | |
| UK2002 #01 Y:2020 | 01 | 2020 | Utilize higher efficiency lamps and/or ballasts | $1,770 | $2,473 | |
| UK2001 #11 Y:2020 | 11 | 2020 | Optimize plant power factor | $31,564 | $19,285 | |
| UK2001 #10 Y:2020 | 10 | 2020 | Replace boiler | $10,114 | $45,600 | |
| UK2001 #09 Y:2020 | 09 | 2020 | Use hot process fluids to preheat incoming process fluids | $252,728 | $102,800 | |
| UK2001 #08 Y:2020 | 08 | 2020 | Insulate bare equipment | $2,547 | $1,006 | |
| UK2001 #07 Y:2020 | 07 | 2020 | Clean condenser tubes | $4,023 | $8,700 | |
| UK2001 #06 Y:2020 | 06 | 2020 | Meter recycled water (to reduce sewer charges) | $118,102 | $6,775 | |
| UK2001 #05 Y:2020 | 05 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $8,684 | $2,240 | |
| UK2001 #04 Y:2020 | 04 | 2020 | Install occupancy sensors | $571 | $875 | |
| UK2001 #03 Y:2020 | 03 | 2020 | Utilize higher efficiency lamps and/or ballasts | $9,887 | $9,378 | |
| UK2001 #02 Y:2020 | 02 | 2020 | Reduce the pressure of compressed air to the minimum required | $1,413 | - | |
| UK2001 #01 Y:2020 | 01 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,076 | $2,010 | |
| UK1916 #10 Y:2019 | 10 | 2019 | Replace electrically-operated equipment with fossil fuel equipment | $139,706 | $225,000 |
n/a
|
| UK1916 #09 Y:2019 | 09 | 2019 | Use waste heat from hot flue gases to preheat | $86,132 | $206,000 |
n/a
|
| UK1916 #08 Y:2019 | 08 | 2019 | Change rate schedules or other changes in utility service | $6,946 | - |
n/a
|
| UK1916 #07 Y:2019 | 07 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,602 | $2,270 |
n/a
|