Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,209

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0298 #11 Y:2025 Install occupancy sensors $2,751 $2,642
UA0298 #10 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,652 $12,707
UA0298 #09 Y:2025 Use radiant heater for spot heating $6,438 $20,795
UA0298 #08 Y:2025 Install timers and/or thermostats $2,303 $886
UA0298 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $24,457 $7,761
UA0298 #06 Y:2025 Upgrade controls on compressors $15,539 $2,872
UA0298 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $19,072 $804
UA0298 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $27,681 $7,744
UA0298 #03 Y:2025 Eliminate or reduce compressed air usage $7,813 $20,150
UA0298 #02 Y:2025 Optimize plant power factor $6,398 $1,977
UA0298 #01 Y:2025 Use solar heat to make electricty $557,887 $5,002,920
UA0297 #07 Y:2025 Install timers and/or thermostats $2,765 $316
UA0297 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,275 $16,734
UA0297 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $3,389 $670
UA0297 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,778 $7,744
UA0297 #03 Y:2025 Eliminate or reduce compressed air usage $15,160 $28,210
UA0297 #02 Y:2025 Optimize plant power factor $38,546 $5,696
UA0297 #01 Y:2025 Use solar heat to make electricty $165,904 $2,630,520
UA0296 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $209 $500
UA0296 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $795 $250