Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ST0080 #07 Y:1986 Use demand controller or load shedder $10,682 $6,000
ST0080 #06 Y:1986 Utilize higher efficiency lamps and/or ballasts $3,264 $2,016
ST0080 #05 Y:1986 Utilize energy-efficient belts and other improved mechanisms $1,206 $558
ST0080 #04 Y:1986 Use most efficient type of electric motors $531 $1,333
ST0080 #03 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $1,370 -
ST0080 #02 Y:1986 Recover waste heat from equipment $9,482 $7,000
ST0080 #01 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $18,901 $59,000
ST0077 #09 Y:1986 Utilize higher efficiency lamps and/or ballasts $735 $278
ST0077 #08 Y:1986 Utilize energy-efficient belts and other improved mechanisms $169 $150
ST0077 #06 Y:1986 Use computer programs to optimize hvac performance $27,027 $30,000
ST0077 #05 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $122 $30
ST0077 #04 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $944 $900
ST0077 #03 Y:1986 Reduce hot water temperature to the minimum required $66 -
ST0077 #02 Y:1986 Install automatic stack damper $878 $846
ST0077 #01 Y:1986 Analyze flue gas for proper air/fuel ratio $381 $537
ST0076 #09 Y:1986 Utilize higher efficiency lamps and/or ballasts $29,024 $2,090
ST0076 #08 Y:1986 Utilize energy-efficient belts and other improved mechanisms $1,730 $400
ST0076 #07 Y:1986 Utilize higher efficiency lamps and/or ballasts $1,490 $1,670
ST0076 #06 Y:1986 Optimize plant power factor $9,576 -
ST0076 #05 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $4,494 $70