| Assessment Year | 1986 |
|---|---|
| Principal Product | ELECTRICAL CONNECTORS |
| NAICS |
n/a
|
| SIC | 3644: Noncurrent-Carrying Wiring Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
n/a
|
| Annual Production | 9,000,000
pieces
|
| Production Hrs. Annual | 6,375
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $174,275 | 1,659,144 |
kWh
|
$0.11 |
| Natural Gas | $12,049 | 1,769 |
MMBtu
|
$6.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $98,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $94,088 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $47,801 | $60,000 |
$47,801
455,158
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $1,121 | $500 | - |
$1,121
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $930 | - |
$930
8,792
kWh
|
- | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,072 | $3,540 |
$2,844
26,964
kWh
|
$(-772.0)
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,494 | $70 |
$4,494
42,790
kWh
|
- | |
| 06 | 2.3212: Optimize plant power factor | $9,576 | - |
$9,576
-
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,490 | $1,670 |
$1,490
14,068
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,730 | $400 |
$1,730
16,413
kWh
|
- | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,024 | $2,090 |
$29,024
276,377
kWh
|
- | |
| TOTAL RECOMMENDED | $98,238 | $68,270 |
$97,889
840,562
kWh
|
$349
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $94,088 | $66,200 |
$93,739
801,289
kWh
|
$349
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs