Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

365

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0050 #05 Y:2026 Use solar heat to make electricty $26,312 $348,375
SJ0050 #04 Y:2026 Lower temperature during the winter season and vice-versa $16,918 -
SJ0050 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,556 $5,088
SJ0050 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $646 -
SJ0050 #01 Y:2026 Install compressor air intakes in coolest locations $420 $619
SJ0049 #07 Y:2026 Use solar heat to make electricty $97,782 $111,738
SJ0049 #06 Y:2026 Lower temperature during the winter season and vice-versa $5,009 -
SJ0049 #05 Y:2026 Use or replace with energy efficient substitutes $6,174 $26,353
SJ0049 #04 Y:2026 Eliminate or reduce compressed air usage $4,177 -
SJ0049 #03 Y:2026 Isolate hot or cold equipment $7,402 $3,682
SJ0049 #02 Y:2026 Recover waste heat from equipment $862 $2,033
SJ0049 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,275 $15,290
SJ0048 #07 Y:2026 Reduce space conditioning during non-working hours $1,595 -
SJ0048 #06 Y:2026 Re-use or recycle hot or cold process exhaust air $1,791 $1,127
SJ0048 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,383 $15,726
SJ0048 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,357 -
SJ0048 #03 Y:2026 Utilize controls to operate equipment only when needed $5,082 $13
SJ0048 #02 Y:2026 Insulate bare equipment $2,105 $1,983
SJ0048 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,488 $7,009
SJ0047 #04 Y:2026 Use optimum temperature $2,016 -