Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0043 #08 Y:2025 Use demand controller or load shedder $5,591 -
SJ0043 #07 Y:2025 Maintain air filters by cleaning or replacement $14,251 $1,430
SJ0043 #06 Y:2025 Use optimum temperature $43,185 -
SJ0043 #05 Y:2025 Replace existing hvac unit with high efficiency model $10,396 $50,000
SJ0043 #04 Y:2025 Eliminate or reduce compressed air usage $97 $264
SJ0043 #03 Y:2025 Eliminate or reduce compressed air usage $551 -
SJ0043 #02 Y:2025 Install occupancy sensors $4,740 $2,894
SJ0043 #01 Y:2025 Use solar heat to make electricty $76,223 $468,058
SJ0042 #09 Y:2025 Use solar heat to make electricty $254,444 $1,522,550
SJ0042 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,895 -
SJ0042 #07 Y:2025 Eliminate or reduce compressed air usage $1,004 -
SJ0042 #06 Y:2025 Eliminate or reduce compressed air usage $2,422 $1,167
SJ0042 #05 Y:2025 Install occupancy sensors $19,412 $41,750
SJ0042 #04 Y:2025 Reduce excessive boiler blowdown $1,078 $2,456
SJ0042 #03 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $258 $1,739
SJ0042 #02 Y:2025 Insulate bare equipment $462 $798
SJ0042 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $26,657 $43,400
SJ0041 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $645 $3,293
SJ0041 #07 Y:2025 Re-use or recycle hot or cold process exhaust air $15,818 $11,594
SJ0041 #06 Y:2025 Install occupancy sensors $37,951 $77,070