Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,372

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0643 #09 Y:2025 Use solar heat to make electricty $1,826,449 $12,059,302
SF0643 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,070 $30,818
SF0643 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $46,662 $211,375
SF0643 #06 Y:2025 Insulate bare equipment $818 $3,408
SF0643 #05 Y:2025 Replace boiler $77,010 $244,130
SF0643 #04 Y:2025 Use computer programs to optimize hvac performance $21,145 $5,099
SF0643 #03 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $12,481 -
SF0643 #02 Y:2025 Eliminate or reduce compressed air usage $41,007 $1,080
SF0643 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,860 $1,920
SF0644 #13 Y:2025 Use solar heat to make electricty $139,427 $781,676
SF0644 #12 Y:2025 Use battery storage for demand control $39,673 $145,800
SF0644 #11 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,685 $23,706
SF0644 #10 Y:2025 Change rate schedules or other changes in utility service $87,216 $146,113
SF0644 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,207 $8,069
SF0644 #08 Y:2025 Re-size charging openings or add movable cover or door $8,178 $5,000
SF0644 #07 Y:2025 Repair faulty insulation in furnaces, boilers, etc $11,403 $3,643
SF0644 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $1,268 $350
SF0644 #05 Y:2025 Reduce space conditioning during non-working hours $11,683 $2,000
SF0644 #04 Y:2025 Turn off equipment when not in use $1,029 -
SF0644 #03 Y:2025 Use demand controller or load shedder $69,072 -