Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,438

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0652 #07 Y:2026 Replace city water with recycled water via cooling tower $111,329 $388,045
SF0652 #06 Y:2026 Use photocell controls $2,716 $12,669
SF0652 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $7,632 $21,317
SF0652 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $313 $462
SF0652 #03 Y:2026 Recharge batteries on during off-peak demand periods $4,938 $5,263
SF0652 #02 Y:2026 Reduce space conditioning during non-working hours $5,780 $4,983
SF0652 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $21,138 $7,872
SF0651 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $8,542 $50,720
SF0651 #05 Y:2026 Install occupancy sensors $860 $2,740
SF0651 #04 Y:2026 Reduce space conditioning during non-working hours $13,854 $29,876
SF0651 #03 Y:2026 Recharge batteries on during off-peak demand periods $2,835 $4,194
SF0651 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $496 $160
SF0651 #01 Y:2026 Reduce space conditioning during non-working hours $31,834 $2,250
SF0650 #06 Y:2026 Use small number of high output units instead of many small inefficient units $49,737 $264,253
SF0650 #05 Y:2026 Recover waste heat from equipment $4,412 $16,375
SF0650 #04 Y:2026 Change rate schedules or other changes in utility service $137,573 $305,377
SF0650 #03 Y:2026 Use minimum steam operating pressure $2,009 $1,080
SF0650 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $6,329 $160
SF0650 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $49,625 -
SF0649 #11 Y:2026 Use solar heat to make electricty $241,826 $1,576,614