ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SF0634 #09 Y:2025 | 09 | 2025 | Use photocell controls | $585 | $1,248 |
n/a
|
SF0634 #08 Y:2025 | 08 | 2025 | Heat water with exhaust heat | $9,559 | $18,756 |
n/a
|
SF0634 #07 Y:2025 | 07 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $6,856 | $6,881 |
n/a
|
SF0634 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $9,362 | $8,453 |
n/a
|
SF0634 #05 Y:2025 | 05 | 2025 | Recharge batteries on during off-peak demand periods | $3,706 | $2,070 |
n/a
|
SF0634 #04 Y:2025 | 04 | 2025 | Utilize controls to operate equipment only when needed | $55,964 | $17,866 |
n/a
|
SF0634 #03 Y:2025 | 03 | 2025 | Eliminate or reduce compressed air usage | $25,314 | $6,300 |
n/a
|
SF0634 #02 Y:2025 | 02 | 2025 | Turn off equipment when not in use | $11,091 | - |
n/a
|
SF0634 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,190 | - |
n/a
|
SF0632 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $15,394 | $12,341 |
n/a
|
SF0632 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $173 | $158 |
n/a
|
SF0632 #02 Y:2024 | 02 | 2024 | Turn off equipment when not in use | $723 | - |
n/a
|
SF0632 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,457 | - |
n/a
|
SF0631 #07 Y:2024 | 07 | 2024 | Recover waste heat from equipment | $4,255 | $13,190 |
n/a
|
SF0631 #06 Y:2024 | 06 | 2024 | Use / purchase optimum sized compressor | $42,980 | $125,625 |
n/a
|
SF0631 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $7,321 | $6,254 |
n/a
|
SF0631 #04 Y:2024 | 04 | 2024 | Insulate bare equipment | $523 | $419 |
n/a
|
SF0631 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $768 | $122 |
n/a
|
SF0631 #02 Y:2024 | 02 | 2024 | Reduce space conditioning during non-working hours | $16,164 | $441 |
n/a
|
SF0631 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,844 | - |
n/a
|