5,425
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0650 #06 Y:2026 | 06 | 2026 | Use small number of high output units instead of many small inefficient units | $49,737 | $264,253 |
n/a
|
| SF0650 #05 Y:2026 | 05 | 2026 | Recover waste heat from equipment | $4,412 | $16,375 |
n/a
|
| SF0650 #04 Y:2026 | 04 | 2026 | Change rate schedules or other changes in utility service | $137,573 | $305,377 |
n/a
|
| SF0650 #03 Y:2026 | 03 | 2026 | Use minimum steam operating pressure | $2,009 | $1,080 |
n/a
|
| SF0650 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,277 | $160 |
n/a
|
| SF0650 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $49,625 | - |
n/a
|
| SF0649 #11 Y:2026 | 11 | 2026 | Use solar heat to make electricty | $241,826 | $1,576,614 |
n/a
|
| SF0649 #10 Y:2026 | 10 | 2026 | Use waste heat from hot flue gases to preheat incoming fluids | $6,422 | $29,062 |
n/a
|
| SF0649 #09 Y:2026 | 09 | 2026 | Make a practice of turning off lights when not needed | $788 | $2,785 |
n/a
|
| SF0649 #08 Y:2026 | 08 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $16,383 | $49,958 |
n/a
|
| SF0649 #07 Y:2026 | 07 | 2026 | Utilize controls to operate equipment only when needed | $1,544 | $4,130 |
n/a
|
| SF0649 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $38,998 | $38,922 |
n/a
|
| SF0649 #05 Y:2026 | 05 | 2026 | Reduce space conditioning during non-working hours | $5,987 | $5,606 |
n/a
|
| SF0649 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $11,258 | $6,264 |
n/a
|
| SF0649 #03 Y:2026 | 03 | 2026 | Analyze flue gas for proper air/fuel ratio | $2,578 | - |
n/a
|
| SF0649 #02 Y:2026 | 02 | 2026 | Eliminate or reduce compressed air usage | $3,116 | $220 |
n/a
|
| SF0649 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,092 | - |
n/a
|
| SF0648 #06 Y:2026 | 06 | 2026 | Adopt in-house material generation | $41,495 | $54,725 |
n/a
|
| SF0648 #05 Y:2026 | 05 | 2026 | Use battery storage for demand control | $25,681 | $73,820 |
n/a
|
| SF0648 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $24,382 | $32,268 |
n/a
|