Assessment Year | 2025 |
---|---|
Principal Product | N/A |
NAICS | 928110: National Security |
SIC | 8999: Services, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 1 |
Plant Area |
7,600,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,393 | 7,747,858 |
kWh
|
$0.050 |
Electricity Demand | $81,401 | 15,619 |
kW-mo/yr
|
$5.21 |
LPG | $100,125 | 3,502 |
MMBtu
|
$28.59 |
Fuel Oil #1 | $2,344,122 | 83,928 |
MMBtu
|
$27.93 |
TOTAL YEARLY COSTS | $2,913,041 | |||
RECOMMENDED SAVINGS* | $1,285,162 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $2,647 | - |
$2,647
52,946
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,624 | - |
$3,824
76,468
kWh
|
- | - | $(-1,200.0) | - | |
03 | 2.6218: Turn off equipment when not in use | $4,615 | - |
$4,039
80,789
kWh
|
$576
-
kW-mo/yr
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $5,286 | - | - | - |
$7,486
-
MMBtu
|
$(-2,200.0) | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,643 | $652 |
$1,643
32,867
kWh
|
- | - | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $861 | $383 |
$861
17,212
kWh
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $17,875 | $9,541 | - | - |
$17,875
-
MMBtu
|
- | - | |
08 | 2.2441: Preheat boiler makeup water with waste process heat | $11,982 | $16,494 | - | - |
$11,982
-
MMBtu
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,776 | $58,115 |
$8,731
174,612
kWh
|
$3,978
-
kW-mo/yr
|
- | $9,973 | $4,094 | |
10 | 2.4226: Use / purchase optimum sized compressor | $35,783 | $137,500 |
$25,392
507,835
kWh
|
$3,626
-
kW-mo/yr
|
$6,765
-
MMBtu
|
- | - | |
11 | 2.1241: Reduce excessive boiler blowdown | $1,760 | $7,144 | - | - |
$1,760
-
MMBtu
|
- | - | |
12 | 2.2447: Heat water with exhaust heat | $14,524 | $59,559 | - | - |
$14,524
-
MMBtu
|
- | - | |
13 | 2.7234: Use heat pump for space conditioning | $1,100,943 | $9,436,593 |
$(-62,204.0)
(-1,244,089)
kWh
|
$(-8,878.0)
-
kW-mo/yr
|
$1,172,025
-
MMBtu
|
- | - | |
14 | 2.1224: Replace boiler | $57,843 | $735,132 | - | - |
$57,843
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $1,285,162 | $10,461,113 |
$(-15,067.0)
(-301,360)
kWh
|
$(-698.0)
-
kW-mo/yr
|
$1,290,260
-
MMBtu
|
$6,573 | $4,094 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs