ITAC Assessment: SF0636
ITAC logo
ITAC Assessment: SF0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product N/A
NAICS 928110: National Security
SIC 8999: Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 1
Plant Area 7,600,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,393 7,747,858
kWh
Electricity Demand $81,401 15,619
kW-mo/yr
LPG $100,125 3,502
MMBtu
Fuel Oil #1 $2,344,122 83,928
MMBtu
TOTAL YEARLY COSTS $2,913,041
RECOMMENDED SAVINGS* $1,285,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $2,647 - $2,647
52,946
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,624 - $3,824
76,468
kWh
- - $(-1,200.0) -
03 2.6218: Turn off equipment when not in use $4,615 - $4,039
80,789
kWh
$576
-
kW-mo/yr
- - -
04 2.2135: Repair and eliminate steam leaks $5,286 - - - $7,486
-
MMBtu
$(-2,200.0) -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,643 $652 $1,643
32,867
kWh
- - - -
06 2.7224: Reduce space conditioning during non-working hours $861 $383 $861
17,212
kWh
- - - -
07 2.2511: Insulate bare equipment $17,875 $9,541 - - $17,875
-
MMBtu
- -
08 2.2441: Preheat boiler makeup water with waste process heat $11,982 $16,494 - - $11,982
-
MMBtu
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $26,776 $58,115 $8,731
174,612
kWh
$3,978
-
kW-mo/yr
- $9,973 $4,094
10 2.4226: Use / purchase optimum sized compressor $35,783 $137,500 $25,392
507,835
kWh
$3,626
-
kW-mo/yr
$6,765
-
MMBtu
- -
11 2.1241: Reduce excessive boiler blowdown $1,760 $7,144 - - $1,760
-
MMBtu
- -
12 2.2447: Heat water with exhaust heat $14,524 $59,559 - - $14,524
-
MMBtu
- -
13 2.7234: Use heat pump for space conditioning $1,100,943 $9,436,593 $(-62,204.0)
(-1,244,089)
kWh
$(-8,878.0)
-
kW-mo/yr
$1,172,025
-
MMBtu
- -
14 2.1224: Replace boiler $57,843 $735,132 - - $57,843
-
MMBtu
- -
TOTAL RECOMMENDED $1,285,162 $10,461,113 $(-15,067.0)
(-301,360)
kWh
$(-698.0)
-
kW-mo/yr
$1,290,260
-
MMBtu
$6,573 $4,094
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs