Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,477

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0701 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $174,361 $805,450
SD0701 #09 Y:2026 Replace obsolete burners with more efficient ones $155,489 -
SD0701 #08 Y:2026 Use insulation in furnaces to facilitate heating / cooling $83,314 $23,101
SD0701 #07 Y:2026 Use waste heat from hot flue gases to preheat $1,956 $1,671
SD0701 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $8,018 $2,153
SD0701 #05 Y:2026 Use most efficient type of electric motors $3,266 $34,026
SD0701 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $918 $8,600
SD0701 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $84 $424
SD0701 #02 Y:2026 Use battery storage for demand control $1,255,541 $298,093
SD0701 #01 Y:2026 Use solar heat to make electricty $605,975 $1,453,756
SD0700 #12 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,040 $2,389
SD0700 #11 Y:2026 Insulate bare equipment $23,068 $6,000
SD0700 #10 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $26,256 $13,966
SD0700 #09 Y:2026 Reduce the pressure of compressed air to the minimum required $30,685 -
SD0700 #08 Y:2026 Use battery storage for demand control $43,016 $105,896
SD0700 #07 Y:2026 Use solar heat to make electricty $117,149 $276,500
SD0700 #06 Y:2026 Use most efficient type of electric motors $26,086 $12,918
SD0700 #05 Y:2026 Eliminate or reduce compressed air usage $3,579 $4,156
SD0700 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $2,072 $2,000
SD0700 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $922 $1,000