Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,319

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0685 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $751 -
SD0685 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,543 $10,618
SD0685 #06 Y:2025 Use most efficient type of electric motors $155 $4,450
SD0685 #05 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $254 $1,200
SD0685 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,111 $3,285
SD0685 #03 Y:2025 Use battery storage for demand control $556,956 $109,721
SD0685 #02 Y:2025 Use solar heat to make electricty $11,104 $28,902
SD0685 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,078 $2,362
SD0684 #07 Y:2025 Shift from daytime to nighttime operation $2,946 $3,570
SD0684 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $270 $254
SD0684 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $290 -
SD0684 #04 Y:2025 Use most efficient type of electric motors $236 $1,823
SD0684 #03 Y:2025 Use insulation in furnaces to facilitate heating / cooling $1,254 $2,437
SD0684 #02 Y:2025 Use battery storage for demand control $8,871 $583
SD0684 #01 Y:2025 Use solar heat to make electricty $24,744 $29,547
SD0683 #10 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $37,873 $48,210
SD0683 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $125 $508
SD0683 #08 Y:2025 Recharge batteries on during off-peak demand periods $5,832 -
SD0683 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $11,477 $8,478
SD0683 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,575 $27,600