5,118
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0512 #04 Y:2006 | 04 | 2006 | Recover waste heat from equipment | $6,300 | $5,000 | |
| OR0512 #03 Y:2006 | 03 | 2006 | Install vinyl strip / high speed / air curtain doors | $7,000 | $5,000 | |
| OR0512 #02 Y:2006 | 02 | 2006 | Reduce combustion air flow to optimum | $32,700 | $20,600 | |
| OR0512 #01 Y:2006 | 01 | 2006 | Install occupancy sensors | $100,600 | $5,500 | |
| OR0511 #09 Y:2006 | 09 | 2006 | Size electric motors for peak operating efficiency | $2,400 | $2,600 | |
| OR0511 #08 Y:2006 | 08 | 2006 | Utilize higher efficiency lamps and/or ballasts | $3,600 | $5,000 | |
| OR0511 #07 Y:2006 | 07 | 2006 | Replace existing chiller with high efficiency model | $3,800 | $4,500 | |
| OR0511 #06 Y:2006 | 06 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,300 | $6,300 | |
| OR0511 #05 Y:2006 | 05 | 2006 | Reduce the pressure of compressed air to the minimum required | $10,800 | - | |
| OR0511 #04 Y:2006 | 04 | 2006 | Install direct acting units in place of compressed air pressure system in safety system | $14,400 | $13,700 | |
| OR0511 #03 Y:2006 | 03 | 2006 | Recover waste heat from equipment | $10,500 | $7,340 | |
| OR0511 #02 Y:2006 | 02 | 2006 | Reduce combustion air flow to optimum | $35,500 | $8,000 | |
| OR0511 #01 Y:2006 | 01 | 2006 | Add equipment/ operators to reduce production bottleneck | $1,200,000 | $400,000 | |
| OR0510 #07 Y:2006 | 07 | 2006 | Use most efficient type of electric motors | $4,900 | $19,200 | |
| OR0510 #06 Y:2006 | 06 | 2006 | Reduce the pressure of compressed air to the minimum required | $1,480 | $5,000 | |
| OR0510 #05 Y:2006 | 05 | 2006 | Install skylights | $4,750 | $12,400 | |
| OR0510 #04 Y:2006 | 04 | 2006 | Insulate bare equipment | $11,250 | $13,600 | |
| OR0510 #03 Y:2006 | 03 | 2006 | Recover waste heat from equipment | $12,200 | $35,000 | |
| OR0510 #02 Y:2006 | 02 | 2006 | Use properly designed and sized hvac equipment | $15,000 | $11,600 | |
| OR0510 #01 Y:2006 | 01 | 2006 | Carefully control water level in mass finishing equipment | $61,000 | $40,000 |