Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OD0172 #03 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $2,087 $1,800
OD0172 #02 Y:2000 Repair or replace steam traps $19,058 $2,100
OD0172 #01 Y:2000 Utilize higher efficiency lamps and/or ballasts $89,664 $154,663
OD0151 #06 Y:1999 Recover heat from exhausted steam, hot air or hot water $180 $725
OD0151 #05 Y:1999 Utilize energy-efficient belts and other improved mechanisms $1,229 $1,815
OD0151 #04 Y:1999 Install skylights $106 $180
OD0151 #03 Y:1999 Use photocell controls $194 $100
OD0151 #02 Y:1999 Install occupancy sensors $45 $95
OD0151 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $855 $487
OD0137 #06 Y:1999 Begin a practice of predictive / preventative maintenance $402 $1,870
OD0137 #05 Y:1999 Install motor voltage controller on lightly loaded motors $870 $240
OD0137 #04 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $2,840 $1,000
OD0137 #03 Y:1999 Utilize energy-efficient belts and other improved mechanisms $90 $100
OD0137 #02 Y:1999 Use most efficient type of electric motors $839 $400
OD0137 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $1,022 $5,528
OD0136 #06 Y:1999 Install motor voltage controller on lightly loaded motors $7,187 $2,200
OD0136 #05 Y:1999 Reduce space conditioning during non-working hours $1,069 $1,870
OD0136 #04 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $622 $800
OD0136 #03 Y:1999 Install occupancy sensors $784 $1,027
OD0136 #02 Y:1999 Disconnect ballasts $1,083 $8,452