3,985
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0497 #09 Y:2013 | 09 | 2013 | Avoid introducing hot, humid, or dirty air into hvac system | $360 | $650 | |
| NC0497 #08 Y:2013 | 08 | 2013 | Develop a repair/replace policy | $3,513 | $4,256 | |
| NC0497 #07 Y:2013 | 07 | 2013 | Reduce illumination to minimum necessary levels | $2,053 | $513 | |
| NC0497 #06 Y:2013 | 06 | 2013 | Use photocell controls | $2,032 | $120 | |
| NC0497 #05 Y:2013 | 05 | 2013 | Install occupancy sensors | $13,386 | $2,785 | |
| NC0497 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $4,827 | $11,647 | |
| NC0497 #03 Y:2013 | 03 | 2013 | Recover waste heat from equipment | $1,793 | $2,250 | |
| NC0497 #02 Y:2013 | 02 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,761 | $100 | |
| NC0497 #01 Y:2013 | 01 | 2013 | Replace electrically-operated equipment with fossil fuel equipment | $15,740 | $70,400 | |
| NC0499 #14 Y:2013 | 14 | 2013 | Develop a repair/replace policy | $2,055 | $4,256 | |
| NC0499 #13 Y:2013 | 13 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,510 | $100 | |
| NC0499 #12 Y:2013 | 12 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,194 | $451 | |
| NC0499 #11 Y:2013 | 11 | 2013 | Install occupancy sensors | $3,113 | $3,202 | |
| NC0499 #10 Y:2013 | 10 | 2013 | Utilize higher efficiency lamps and/or ballasts | $3,040 | $12,800 | |
| NC0499 #09 Y:2013 | 09 | 2013 | Utilize higher efficiency lamps and/or ballasts | $8,448 | $18,119 | |
| NC0499 #08 Y:2013 | 08 | 2013 | Recharge batteries on during off-peak demand periods | $5,104 | $200 | |
| NC0499 #07 Y:2013 | 07 | 2013 | Repair and eliminate steam leaks | $1,306 | $1,750 | |
| NC0499 #06 Y:2013 | 06 | 2013 | Install / repair insulation on steam lines | $1,539 | $1,165 | |
| NC0499 #05 Y:2013 | 05 | 2013 | Insulate bare equipment | $3,164 | $1,617 | |
| NC0499 #04 Y:2013 | 04 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $10,670 | $35,000 |