3,792
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0467 #08 Y:2025 | 08 | 2025 | Use solar heat to make electricty | $146,758 | $671,919 |
n/a
|
| MI0467 #07 Y:2025 | 07 | 2025 | Replace existing hvac unit with high efficiency model | $26,731 | $45,465 |
n/a
|
| MI0467 #06 Y:2025 | 06 | 2025 | Use photocell controls | $742 | $720 |
n/a
|
| MI0467 #05 Y:2025 | 05 | 2025 | Turn off equipment when not in use | $4,820 | $2,600 |
n/a
|
| MI0467 #04 Y:2025 | 04 | 2025 | Recharge batteries on during off-peak demand periods | $9,626 | $320 |
n/a
|
| MI0467 #03 Y:2025 | 03 | 2025 | Air condition only space necessary | $47,824 | $1,440 |
n/a
|
| MI0467 #02 Y:2025 | 02 | 2025 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $31,123 | $711 |
n/a
|
| MI0467 #01 Y:2025 | 01 | 2025 | Lower temperature during the winter season and vice-versa | $16,554 | - |
n/a
|
| MI0466 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,327 | $3,414 |
n/a
|
| MI0466 #05 Y:2025 | 05 | 2025 | Optimize plant power factor | $8,024 | $18,830 |
n/a
|
| MI0466 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,309 | $4,560 |
n/a
|
| MI0466 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,332 | $1,020 |
n/a
|
| MI0466 #02 Y:2025 | 02 | 2025 | Change rate schedules or other changes in utility service | $1,368 | $100 |
n/a
|
| MI0466 #01 Y:2025 | 01 | 2025 | Change rate schedules or other changes in utility service | $58,107 | $6,400 |
n/a
|
| MI0465 #07 Y:2025 | 07 | 2025 | Utilize higher efficiency lamps and/or ballasts | $7,975 | $22,686 |
n/a
|
| MI0465 #06 Y:2025 | 06 | 2025 | Air condition only space necessary | $4,597 | $5,600 |
n/a
|
| MI0465 #05 Y:2025 | 05 | 2025 | Upgrade controls on compressors | $42,932 | $22,088 |
n/a
|
| MI0465 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $31,692 | $1,185 |
n/a
|
| MI0465 #03 Y:2025 | 03 | 2025 | Lower temperature during the winter season and vice-versa | $11,875 | $210 |
n/a
|
| MI0465 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $14,250 | - |
n/a
|