Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,760

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0463 #05 Y:2025 Install partitions to reduce size of conditioned space $13,397 $26,570
MI0463 #04 Y:2025 Turn off equipment during breaks, reduce operating time $10,085 $1,600
MI0463 #03 Y:2025 Reduce space conditioning during non-working hours $4,194 -
MI0463 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,549 -
MI0463 #01 Y:2025 Recharge batteries on during off-peak demand periods $4,871 -
MI0461 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,646 $33,112
MI0461 #04 Y:2025 Turn off equipment during breaks, reduce operating time $3,684 $2,240
MI0461 #03 Y:2025 Lower temperature during the winter season and vice-versa $4,724 $1,840
MI0461 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,685 -
MI0461 #01 Y:2025 Recharge batteries on during off-peak demand periods $7,156 -
MI0460 #09 Y:2025 Install occupancy sensors $1,057 $1,380
MI0460 #08 Y:2025 Insulate bare equipment $3,469 $1,976
MI0460 #07 Y:2025 Change rate schedules or other changes in utility service $4,172 $100
MI0460 #06 Y:2025 Install vinyl strip / high speed / air curtain doors $5,938 $8,638
MI0460 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,837 $3,373
MI0460 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,111 $1,620
MI0460 #03 Y:2025 Optimize plant power factor $13,405 $29,632
MI0460 #02 Y:2025 Lower temperature during the winter season and vice-versa $46,085 $240
MI0460 #01 Y:2025 Change rate schedules or other changes in utility service $53,117 $3,200
MI0459 #08 Y:2025 Use most efficient type of electric motors $1,616 $3,453