3,842
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0475 #06 Y:2026 | 06 | 2026 | Use or replace with energy efficient substitutes | $19,598 | $90,000 |
n/a
|
| MI0475 #05 Y:2026 | 05 | 2026 | Install occupancy sensors | $170 | $150 |
n/a
|
| MI0475 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $5,650 | $2,600 |
n/a
|
| MI0475 #03 Y:2026 | 03 | 2026 | Use power during off-peak periods | $10,851 | - |
n/a
|
| MI0475 #02 Y:2026 | 02 | 2026 | Lower temperature during the winter season and vice-versa | $2,228 | - |
n/a
|
| MI0475 #01 Y:2026 | 01 | 2026 | Change rate schedules or other changes in utility service | $5,182 | - |
n/a
|
| MI0474 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $1,524 | $4,106 |
n/a
|
| MI0474 #06 Y:2026 | 06 | 2026 | Insulate bare equipment | $543 | $1,164 |
n/a
|
| MI0474 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $442 | $852 |
n/a
|
| MI0474 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $1,408 | $2,359 |
n/a
|
| MI0474 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $11,967 | $2,220 |
n/a
|
| MI0474 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,424 | $1,576 |
n/a
|
| MI0474 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $55,819 | $1,840 |
n/a
|
| MI0473 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $5,599 | $23,200 |
n/a
|
| MI0473 #05 Y:2026 | 05 | 2026 | Install vinyl strip / high speed / air curtain doors | $625 | $1,200 |
n/a
|
| MI0473 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $2,046 | $2,600 |
n/a
|
| MI0473 #03 Y:2026 | 03 | 2026 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $253 | $80 |
n/a
|
| MI0473 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,098 | $1,980 |
n/a
|
| MI0473 #01 Y:2026 | 01 | 2026 | Use power during off-peak periods | $3,799 | - |
n/a
|
| MI0472 #06 Y:2025 | 06 | 2025 | Use most efficient type of electric motors | $525 | $1,254 |
n/a
|