Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,705

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0454 #07 Y:2024 Replace existing hvac unit with high efficiency model $22,309 $111,252
MI0454 #06 Y:2024 Use solar heat to make electricty $78,625 $364,596
MI0454 #05 Y:2024 Install vinyl strip / high speed / air curtain doors $905 $4,156
MI0454 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $6,118 $11,755
MI0454 #03 Y:2024 Turn off equipment when not in use $10,560 $7,300
MI0454 #02 Y:2024 Use optimum temperature $31,534 $960
MI0454 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $2,818 -
MI0452 #10 Y:2024 Use solar heat to make electricty $53,529 $245,201
MI0452 #09 Y:2024 Repair faulty insulation in furnaces, boilers, etc $204 $590
MI0452 #08 Y:2024 Replace existing hvac unit with high efficiency model $5,068 $14,019
MI0452 #07 Y:2024 Improve air circulation with destratification fans / other methods $2,069 $3,165
MI0452 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $14,517 $21,120
MI0452 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $16,650 $23,081
MI0452 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $6,049 $4,092
MI0452 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,550 $1,660
MI0452 #02 Y:2024 Reschedule plant operations or reduce load to avoid peaks $1,989 $960
MI0452 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $5,470 $860
MI0453 #05 Y:2024 Install occupancy sensors $4,117 $1,690
MI0453 #04 Y:2024 Use most efficient type of electric motors $8,976 $11,882
MI0453 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $14,219 $14,799