Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,850

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0476 #08 Y:2026 Install occupancy sensors $38 $121
MI0476 #07 Y:2026 Optimize plant power factor $8,555 $25,634
MI0476 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $345 $994
MI0476 #05 Y:2026 Close holes and openings in building such as broken windows $49 $71
MI0476 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $9,799 $1,686
MI0476 #03 Y:2026 Lower temperature during the winter season and vice-versa $461 $60
MI0476 #02 Y:2026 Change rate schedules or other changes in utility service $1,092 $104
MI0476 #01 Y:2026 Use solar heat to make electricty $73,707 $1,380
MI0475 #06 Y:2026 Use or replace with energy efficient substitutes $19,598 $90,000
MI0475 #05 Y:2026 Install occupancy sensors $170 $150
MI0475 #04 Y:2026 Turn off equipment when not in use $5,650 $2,600
MI0475 #03 Y:2026 Use power during off-peak periods $10,851 -
MI0475 #02 Y:2026 Lower temperature during the winter season and vice-versa $2,228 -
MI0475 #01 Y:2026 Change rate schedules or other changes in utility service $5,182 -
MI0474 #07 Y:2026 Install occupancy sensors $1,524 $4,106
MI0474 #06 Y:2026 Insulate bare equipment $543 $1,164
MI0474 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $442 $852
MI0474 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,408 $2,359
MI0474 #03 Y:2026 Eliminate or reduce compressed air usage $11,967 $2,220
MI0474 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $11,424 $1,576