Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,792

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0467 #08 Y:2025 Use solar heat to make electricty $146,758 $671,919
MI0467 #07 Y:2025 Replace existing hvac unit with high efficiency model $26,731 $45,465
MI0467 #06 Y:2025 Use photocell controls $742 $720
MI0467 #05 Y:2025 Turn off equipment when not in use $4,820 $2,600
MI0467 #04 Y:2025 Recharge batteries on during off-peak demand periods $9,626 $320
MI0467 #03 Y:2025 Air condition only space necessary $47,824 $1,440
MI0467 #02 Y:2025 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $31,123 $711
MI0467 #01 Y:2025 Lower temperature during the winter season and vice-versa $16,554 -
MI0466 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,327 $3,414
MI0466 #05 Y:2025 Optimize plant power factor $8,024 $18,830
MI0466 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,309 $4,560
MI0466 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,332 $1,020
MI0466 #02 Y:2025 Change rate schedules or other changes in utility service $1,368 $100
MI0466 #01 Y:2025 Change rate schedules or other changes in utility service $58,107 $6,400
MI0465 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,975 $22,686
MI0465 #06 Y:2025 Air condition only space necessary $4,597 $5,600
MI0465 #05 Y:2025 Upgrade controls on compressors $42,932 $22,088
MI0465 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $31,692 $1,185
MI0465 #03 Y:2025 Lower temperature during the winter season and vice-versa $11,875 $210
MI0465 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $14,250 -