ITAC Assessment: MI0460
ITAC logo
ITAC Assessment: MI0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bread and Pastry
NAICS 311211: Flour Milling
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 24,000
ft2
Annual Production 19,760,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $934,388 4,272,840
kWh
Electricity Demand $94,954 10,028
kW-mo/yr
Electricity Fees $5,370 -
TOTAL YEARLY COSTS $1,034,712
RECOMMENDED SAVINGS* $144,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8114: Change rate schedules or other changes in utility service $53,117 $3,200 - - $53,117
02 2.7221: Lower temperature during the winter season and vice-versa $46,085 $240 $43,508
198,667
kWh
$2,577
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $13,405 $29,632 - $13,405
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,111 $1,620 $9,316
42,541
kWh
$795
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,837 $3,373 $6,312
28,823
kWh
$525
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $5,938 $8,638 $5,606
25,598
kWh
$332
-
kW-mo/yr
-
07 2.8114: Change rate schedules or other changes in utility service $4,172 $100 - - $4,172
08 2.2511: Insulate bare equipment $3,469 $1,976 $3,275
14,955
kWh
$194
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $1,057 $1,380 $1,057
4,826
kWh
- -
TOTAL RECOMMENDED $144,191 $50,159 $69,074
315,410
kWh
$17,828
-
kW-mo/yr
$57,289
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs