Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,055

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LL0369 #09 Y:2012 Begin a practice of predictive / preventative maintenance $10,920 $2,084
LL0369 #08 Y:2012 Utilize higher efficiency lamps and/or ballasts $188 $213
LL0369 #07 Y:2012 Reduce illumination to minimum necessary levels $200 $155
LL0369 #06 Y:2012 Install occupancy sensors $419 $735
LL0369 #05 Y:2012 Conserve energy by efficient use of vending machines $584 $735
LL0369 #04 Y:2012 Reduce space conditioning during non-working hours $1,500 $660
LL0369 #03 Y:2012 Begin a practice of predictive / preventative maintenance $2,943 $630
LL0369 #02 Y:2012 Use photocell controls $3,740 $120
LL0369 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $54,656 $11,200
LL0368 #10 Y:2012 Utilize higher efficiency lamps and/or ballasts $769 $418
LL0368 #09 Y:2012 Utilize higher efficiency lamps and/or ballasts $932 $4,620
LL0368 #08 Y:2012 Conserve energy by efficient use of vending machines $940 $1,654
LL0368 #07 Y:2012 Reduce space conditioning during non-working hours $1,061 $1,089
LL0368 #06 Y:2012 Begin a practice of predictive / preventative maintenance $1,986 $1,500
LL0368 #05 Y:2012 Install occupancy sensors $1,648 $5,820
LL0368 #04 Y:2012 Air condition only space necessary $15,433 $30
LL0368 #03 Y:2012 Begin a practice of predictive / preventative maintenance $17,664 $6,849
LL0368 #02 Y:2012 Reduce illumination to minimum necessary levels $110,468 $2,180
LL0368 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $157,413 $35,600
LL0367 #07 Y:2012 Conserve energy by efficient use of vending machines $165 $188