| Assessment Year | 2012 |
|---|---|
| Principal Product | Ships |
| NAICS | 336612: Boat Building |
| SIC | 3732: Boat Building and Repairing |
| Sales Range | $100 M to 500M |
| # of Employees | 700 |
| Plant Area |
300,000
ft2
|
| Annual Production | 4
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $797,144 | 10,829,000 |
kWh
|
$0.074 |
| Electricity Demand | $4,118 | 7,487 |
kW-mo/yr
|
$0.55 |
| Electricity Fees | $4,180 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $308,313 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $157,413 | $35,600 |
$157,247
2,136,215
kWh
|
$166
-
kW-mo/yr
|
- | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $110,468 | $2,180 |
$109,061
1,481,607
kWh
|
$1,407
-
kW-mo/yr
|
- | - | |
| 03 | 4.611: Begin a practice of predictive / preventative maintenance | $17,664 | $6,849 | - | - | $17,664 | - | |
| 04 | 2.7229: Air condition only space necessary | $15,433 | $30 |
$15,433
209,664
kWh
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $1,648 | $5,820 |
$1,648
22,384
kWh
|
- | - | - | |
| 06 | 4.611: Begin a practice of predictive / preventative maintenance | $1,986 | $1,500 |
$486
6,601
kWh
|
- | - | $1,500 | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $1,061 | $1,089 |
$1,061
14,416
kWh
|
- | - | - | |
| 08 | 2.6211: Conserve energy by efficient use of vending machines | $940 | $1,654 |
$940
12,776
kWh
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $932 | $4,620 |
$902
12,252
kWh
|
$30
-
kW-mo/yr
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $769 | $418 |
$769
10,442
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $308,313 | $59,760 |
$287,547
3,906,357
kWh
|
$1,602
-
kW-mo/yr
|
$17,664 | $1,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs