ITAC Assessment: WV0227
ITAC logo
ITAC Assessment: WV0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Lithographic sheets
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 158,000
ft2
Annual Production 115,000
ton
Production Hrs. Annual 6,984
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,423 14,096,000
kWh
Electricity Demand $249,871 30,055
kW-mo/yr
Natural Gas $1,234,310 197,979
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,919 $750 $2,897
101,085
kWh
$2,022
-
kW-mo/yr
- - - -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $1,589 $1,980 $1,074
37,504
kWh
$515
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $913 $100 $587
20,510
kWh
$326
-
kW-mo/yr
- - - -
04 2.2625: Chill water to the highest temperature possible $704 $50 $453
15,822
kWh
$251
-
kW-mo/yr
- - - -
05 2.2696: Use excess cold process fluid for industrial cooling needs $603 $390 $386
13,478
kWh
$217
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $275 $112 - - $275
-
MMBtu
- - -
07 2.4157: Establish a predictive maintenance program $31,855 $2,000 $21,552
751,545
kWh
$10,303
-
kW-mo/yr
- - - -
08 2.7111: Reduce illumination to minimum necessary levels $12,200 $1,000 $7,820
273,076
kWh
$4,380
-
kW-mo/yr
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,150 $2,910 $663
23,147
kWh
$487
-
kW-mo/yr
- - - -
10 2.2437: Recover waste heat from equipment $16,267 $3,000 - - $16,267
-
MMBtu
- - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $5,814 $100 $3,935
137,417
kWh
$1,879
-
kW-mo/yr
- - - -
12 3.3111: Adjust ph for neutralization $8,625 $13,725 - - - $8,625
-
gal
- -
13 3.5316: Contract a wood pallet recycling company $1,200 $75 - - - - $1,200
-
lb
-
14 4.441: Install automatic packing equipment $110,000 $85,000 - - - - - $110,000
TOTAL RECOMMENDED $196,114 $111,192 $39,367
1,373,584
kWh
$20,380
-
kW-mo/yr
$16,542
-
MMBtu
$8,625
-
gal
$1,200
-
lb
$110,000
TOTAL IMPLEMENTED $58,929 $7,437 $37,840
1,320,258
kWh
$19,614
-
kW-mo/yr
$275
-
MMBtu
- $1,200
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs