Assessment Year | 2006 |
---|---|
Principal Product | seals and valves |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
182,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 6,280
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $399,704 | 6,093,966 |
kWh
|
$0.066 |
Electricity Demand | $252,349 | 14,086 |
kW-mo/yr
|
$17.91 |
Natural Gas | $72,038 | 8,630 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $466,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,093 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $615 | $200 |
$414
5,588
kWh
|
$201
-
kW-mo/yr
|
- | - | |
02 | 2.6122: Adjust vents to minimize energy use | $19,700 | - |
$19,700
197,000
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,130 | $8,728 |
$667
9,017
kWh
|
$463
-
kW-mo/yr
|
- | - | |
04 | 4.431: Train operators for maximum operating efficiency | $433,948 | $1,000 |
$25,948
350,750
kWh
|
- | - | $408,000 | |
05 | 4.454: Modify startup/shutdown times | $10,000 | - | - | - |
$10,000
-
MMBtu
|
- | |
06 | 4.451: Add additional production shift | $1,348 | - |
$1,348
18,224
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $466,741 | $9,928 |
$48,077
580,579
kWh
|
$664
-
kW-mo/yr
|
$10,000
-
MMBtu
|
$408,000 | ||
TOTAL IMPLEMENTED | $3,093 | $8,928 |
$2,429
32,829
kWh
|
$664
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs