ITAC Assessment: IA0531
ITAC logo
ITAC Assessment: IA0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fuel Trailers
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 80,000
ft2
Annual Production 1,500
units
Production Hrs. Annual 2,250
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,228 624,631
kWh
Electricity Demand $45,509 4,458
kW-mo/yr
Electricity Fees $12,314 -
Other Gas $34,792 2,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,301 $10,600 $105
2,715
kWh
$3,196
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $1,788 $70 $828
21,403
kWh
$960
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $388 $35 $180
4,641
kWh
$208
-
kW-mo/yr
04 2.4239: Eliminate or reduce compressed air usage $1,040 $100 $97
2,515
kWh
$943
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $321 $1,383 $166
4,317
kWh
$155
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $910 $2,314 $421
10,890
kWh
$489
-
kW-mo/yr
07 2.7135: Install occupancy sensors $475 $1,776 $475
12,272
kWh
-
TOTAL RECOMMENDED $8,223 $16,278 $2,272
58,753
kWh
$5,951
-
kW-mo/yr
TOTAL IMPLEMENTED $3,691 $1,981 $1,580
40,831
kWh
$2,111
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs