ITAC Assessment: MS0212
ITAC logo
ITAC Assessment: MS0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Tail Sections
NAICS
n/a
SIC 3721: Aircraft
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 12
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,995 2,010,000
kWh
Electricity Demand $52,203 9,762
kW-mo/yr
Electricity Fees $63,686 -
Natural Gas $17,024 2,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $1,698 $1,707 $89
2,638
kWh
- $1 $1,608
-
MMBtu
- -
02 2.4314: Use synthetic lubricant $1,158 $760 $470
13,988
kWh
$566
-
kW-mo/yr
$15 - - $107
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $982 $477 $967
28,775
kWh
- $15 - - -
04 4.652: Replace existing equipment with more suitable substitutes $29,000 $79,245 - - - - $29,000 -
TOTAL RECOMMENDED $32,838 $82,189 $1,526
45,401
kWh
$566
-
kW-mo/yr
$31 $1,608
-
MMBtu
$29,000 $107
TOTAL IMPLEMENTED $29,982 $79,722 $967
28,775
kWh
- $15 - $29,000 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs