Assessment Year | 2015 |
---|---|
Principal Product | Bakery Products |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
38,000
ft2
|
Annual Production | 68,760,318
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,580 | 2,128,213 |
kWh
|
$0.054 |
Electricity Demand | $52,619 | 5,549 |
kW-mo/yr
|
$9.48 |
Natural Gas | $244,866 | 47,340 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,312 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,007 | $1,150 |
$4,007
74,190
kWh
|
- | - | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $2,191 | $8,250 |
$2,191
40,570
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $699 | $1,752 |
$562
10,402
kWh
|
$137
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $710 | $806 |
$710
13,140
kWh
|
- | - | - | |
05 | 2.7231: Use radiant heater for spot heating | $34,469 | $69,120 | - | - | - |
$34,469
-
MMBtu
|
|
06 | 2.7232: Replace existing hvac unit with high efficiency model | $3,077 | $10,897 |
$2,212
40,967
kWh
|
$865
-
kW-mo/yr
|
- | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $421 | $1,460 |
$421
7,802
kWh
|
- | - | - | |
08 | 2.7211: Clean and maintain refrigerant condensers and towers | $64 | $46 |
$64
1,193
kWh
|
- | - | - | |
09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,274 | $460 | - | - | - |
$1,274
-
MMBtu
|
|
10 | 2.2437: Recover waste heat from equipment | $10,628 | $60,000 | - | - | - |
$10,628
-
MMBtu
|
|
11 | 2.2511: Insulate bare equipment | $341 | $208 | - | - | - |
$341
-
MMBtu
|
|
12 | 2.3212: Optimize plant power factor | $7,346 | $12,507 | - | - | $7,346 | - | |
13 | 2.2511: Insulate bare equipment | $18,908 | $74,880 | - | - | - |
$18,908
-
MMBtu
|
|
TOTAL RECOMMENDED | $84,135 | $241,536 |
$10,167
188,264
kWh
|
$1,002
-
kW-mo/yr
|
$7,346 |
$65,620
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,312 | $22,555 |
$9,036
167,322
kWh
|
$1,002
-
kW-mo/yr
|
- |
$1,274
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs