Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,749

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0215 #11 Y:2025 Use proper thickness of insulation on building envelope $1,206 $2,279
IP0215 #10 Y:2025 Optimize plant power factor $26,556 $45,576
IP0215 #09 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $10,982 $16,152
IP0215 #08 Y:2025 Install compressor air intakes in coolest locations $5,523 $960
IP0215 #07 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $58,146 $9,960
IP0215 #06 Y:2025 Recover waste heat from equipment $33,297 $5,271
IP0215 #05 Y:2025 Reduce illumination to minimum necessary levels $2,235 $276
IP0215 #04 Y:2025 Turn off equipment when not in use $6,861 $1,390
IP0215 #03 Y:2025 Use properly designed and sized hvac equipment $13,579 $790
IP0215 #02 Y:2025 Eliminate or reduce compressed air usage $26,770 $1,390
IP0215 #01 Y:2025 Reduce ventilation air $14,470 -
IP7027 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $672 $3,229
IP7027 #03 Y:2025 Install outside air damper / economizer on hvac unit $3,551 $11,300
IP7027 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,297 $1,750
IP7027 #01 Y:2025 Reduce illumination to minimum necessary levels $715 $77
IP7026 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,603 $19,501
IP7026 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $284 $391
IP7026 #03 Y:2025 Insulate glazing, walls, ceilings, and roofs $103 $140
IP7026 #02 Y:2025 Install occupancy sensors $1,033 $1,104
IP7026 #01 Y:2025 Reduce illumination to minimum necessary levels $2,139 $283