Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,788

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0221 #07 Y:2026 Insulate bare equipment $207 $965
IP0221 #06 Y:2026 Eliminate or reduce compressed air usage $3,869 $7,020
IP0221 #05 Y:2026 Meter recycled water (to reduce sewer charges) $10,527 $5,080
IP0221 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $24,357 $3,140
IP0221 #03 Y:2026 Turn off equipment when not in use $5,246 $160
IP0221 #02 Y:2026 Install compressor air intakes in coolest locations $18,974 $542
IP0221 #01 Y:2026 Eliminate or reduce compressed air usage $34,793 -
IP0220 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,624 $4,000
IP0220 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $5,726 $12,000
IP0220 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,424 $12,100
IP0220 #03 Y:2026 Eliminate or reduce compressed air usage $13,177 $14,000
IP0220 #02 Y:2026 Upgrade controls on compressors $564 $500
IP0220 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,222 $40
IP0219 #07 Y:2025 Replace fossil fuel equipment with electrical equipment $51,010 $80,000
IP0219 #06 Y:2025 Install compressor air intakes in coolest locations $2,631 $974
IP0219 #05 Y:2025 Use solar heat to make electricty $92,696 $900,763
IP0219 #04 Y:2025 Recover waste heat from equipment $5,372 $1,319
IP0219 #03 Y:2025 Turn off equipment when not in use $9,717 -
IP0219 #02 Y:2025 Recharge batteries on during off-peak demand periods $9,724 -
IP0219 #01 Y:2025 Moderate cooling tower outlet temperature $73,439 -