| CI0082 #07 Y:2026 | 07 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $674 | $7,500 |
n/a
|
| CI0082 #06 Y:2026 | 06 | 2026 | Adjust / maintain fork lift trucks for most efficient operation | $1,644 | $12,000 |
n/a
|
| CI0082 #05 Y:2026 | 05 | 2026 | Replace existing hvac unit with high efficiency model | $1,818 | $8,000 |
n/a
|
| CI0082 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $2,859 | $360 |
n/a
|
| CI0082 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $2,897 | $1,350 |
n/a
|
| CI0082 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,085 | $3,195 |
n/a
|
| CI0082 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,271 | $5,300 |
n/a
|
| CI0078 #06 Y:2026 | 06 | 2026 | Reduce heat gain by window tinting | $1,785 | $4,000 |
n/a
|
| CI0078 #05 Y:2026 | 05 | 2026 | Install timers and/or thermostats | $3,677 | $10,000 |
n/a
|
| CI0078 #04 Y:2026 | 04 | 2026 | Recycle air for heating, ventilation and air conditioning | $7,354 | $18,000 |
n/a
|
| CI0078 #03 Y:2026 | 03 | 2026 | Replace boiler | $13,617 | $40,000 |
n/a
|
| CI0078 #02 Y:2026 | 02 | 2026 | Level one – add communication using iiot devices to existing control system to modify operations | $28,448 | $7,760 |
n/a
|
| CI0078 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $33,943 | $124,720 |
n/a
|
| CI0076 #06 Y:2026 | 06 | 2026 | Turn off equipment when not in use | $1,037 | $500 |
n/a
|
| CI0076 #05 Y:2026 | 05 | 2026 | Reduce fluid flow rates | $2,078 | $8,000 |
n/a
|
| CI0076 #04 Y:2026 | 04 | 2026 | Insulate glazing, walls, ceilings, and roofs | $5,066 | $10,000 |
n/a
|
| CI0076 #03 Y:2026 | 03 | 2026 | Recharge batteries on during off-peak demand periods | $7,670 | $100 |
n/a
|
| CI0076 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,970 | $4,600 |
n/a
|
| CI0076 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $81,183 | $628,346 |
n/a
|
| CI0075 #09 Y:2026 | 09 | 2026 | Install occupancy sensors | $2,560 | $900 |
n/a
|