Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

997

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0154 #07 Y:2021 Re-size charging openings or add movable cover or door $893 $710
BS0154 #06 Y:2021 Recover waste heat from equipment $8,288 $6,000
BS0154 #05 Y:2021 Adopt in-house material generation $182,277 $204,462
BS0154 #04 Y:2021 Eliminate or reduce compressed air usage $766 $25
BS0154 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,232 $320
BS0154 #02 Y:2021 Install occupancy sensors $679 $280
BS0154 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,750 $3,231
BS0153 #04 Y:2021 Use or replace with energy efficient substitutes $98,310 $307,800
BS0153 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $733 $490
BS0153 #02 Y:2021 Use most efficient type of electric motors $36,134 $5,961
BS0153 #01 Y:2021 Install occupancy sensors $30,759 $3,726
BS0152 #05 Y:2021 Use or replace with energy efficient substitutes $71,968 $162,000
BS0152 #04 Y:2021 Install occupancy sensors $60,903 $7,355
BS0152 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $701 $414
BS0152 #02 Y:2021 Use most efficient type of electric motors $7,503 $8,301
BS0152 #01 Y:2021 Use waste heat from hot flue gases to preheat $81,594 $114,156
BS0151 #04 Y:2021 Reduce the pressure of compressed air to the minimum required $272 $522
BS0151 #03 Y:2021 Insulate bare equipment $8,310 $527
BS0151 #02 Y:2021 Re-size charging openings or add movable cover or door $893 $710
BS0151 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $2,055 $2,536